Skip to content
The service is in beta: the free concept is available; paid packages are offered by individual quote.
archi.sulerr
120 m² detached house — Bavaria — hero drawing

Drawing in the project country's language: DE

Demo projectNew build · Germany

120 m² detached house — Bavaria

Detached house with a ground floor and a converted attic storey, 38° gable roof, monolithic brick walls, heat pump, ventilation with heat recovery and 8 kWp of solar panels on a fictional plot in Bavaria.

Demo project — an example of what our pipeline prepares; not signed, not submitted. The set was generated by the pipeline and passed through automatic checks as a demonstration of scope; no specialist reviewed it.

Area
120 m²
Jurisdiction
DE
Year
Demo, 2026
Product
Demo scope
Scope
ARCDELWRHVCS

Brief

Fictional client and plot. 119.9 m² living area per WoFlV (roof slopes weighted by clear height, stair not counted; about 135 m² of room area, 170 m² gross over two storeys); basis: BayBO and GEG (route: building application, or notification procedure under Art. 58 BayBO where a development plan exists). A 10 × 8.5 m footprint does not reach 150 m² of living area; the computed value is stated.

Outcome

Demo project on a fictional plot. Set generated from a parametric model and passed through automatic checks as a demonstration of scope. Not reviewed by a specialist, not signed, not submitted.

Notes

All 74 drawing sheets and 4 documents (architecture, structure, electrical, water and drainage, heating and ventilation, energy, cost and planning) are generated from one parametric model and are in German only. Insulation values (wall U ≤ 0.20, roof U ≤ 0.14, windows ≤ 0.9 W/m²K) are design targets, not GEG calculations; the setback distances follow Art. 6 BayBO in simplified form only, the foundation is a principle only. The sheets are a concept, not for permit or construction.

Drawing gallery

Open a sheet to zoom (mouse wheel, drag, + / −, 0 = fit) and browse (← →). The viewer shows the original SVG.

Drawing in the project country's language: DE

ARArchitecture· 23

  • AR-01 · Lageplan

  • AR-02 · Grundriss Erdgeschoss

  • AR-03 · Grundriss Dachgeschoss

  • AR-04 · Dachaufsicht

  • AR-05 · Ansichten Nord + Ost

  • AR-06 · Ansichten Süd + West

  • AR-07 · Section A-A

  • AR-08 · Section B-B

  • AR-09 · Details: foundation and floor

  • AR-10 · Details: facade

  • AR-11 · Details: window frames

  • AR-12 · Details: roof

  • AR-13 · Axonometrie Südost

  • AR-14 · Perspektive Südost (schematisch)

  • AR-15 · Room schedule

  • AR-16 · Window and frame schedule

  • AR-17 · Door schedule

  • AR-18 · Material schedule

  • AR-19 · Finishes schedule

  • AR-20 · Masonry coursing and dimensions

  • AR-21 · Fire safety

  • AR-22 · Accessibility and BayBO checklist

  • AR-23 · Details: interior and stair

CDStructure· 12

  • CD-01 · Foundation plan and concrete pour plan

  • CD-02 · Foundation beam reinforcement and bending schedule

  • CD-03 · Ground floor slab

  • CD-04 · First floor slab

  • CD-05 · Load-bearing walls and lintels

  • CD-06 · Roof structure

  • CD-07 · Structural details

  • CD-08 · Stability

  • CD-09 · Loads and design basis

  • Structural calculationCD-10 · PDF document · A4
  • CD-11 · Structural quantities

  • CD-12 · Structural inspection plan

ELElectrical· 8

  • EL-01 · Electrical plan ground floor

  • EL-02 · Electrical plan first floor

  • EL-03 · Verteiler (Übersichtsschaltplan), PV und Wärmepumpe

  • EL-04 · Electrical calculations

  • EL-05 · Earthing and equipotential bonding

  • EL-06 · Cable routes

  • EL-07 · PV, charge point and EMS

  • EL-08 · Electrical materials list

WRWater & drainage· 6

  • WR-01 · Water and drainage ground floor

  • WR-02 · Water, drainage and rainwater first floor

  • WR-03 · Drainage and rainwater isometric

  • WR-04 · Calculation DIN 1986-100

  • WR-05 · Bathroom sanitary specification

  • WR-06 · Water and drainage materials list

HVHeating & ventilation· 9

  • HV-01 · Heat loss calculation

  • HV-02 · Underfloor heating layout

  • HV-03 · Heat pump and hydraulic diagram

  • HV-04 · Ventilation HRV duct plan

  • HV-05 · Controls

  • HV-06 · Commissioning protocol

  • HV-07 · Installation isometric

  • HV-08 · HVAC materials list

  • HV-09 · Installation details

ENEnergy· 6

  • EN-01 · Thermal envelope

  • EN-02 · GEG compliance (indicative)

  • EN-03 · Daylight

  • EN-04 · Ventilation

  • EN-05 · Acoustics and fire

  • EN-06 · Environmental performance and material passport

CSCost· 8

  • CS-01 · Element estimate

  • CS-02 · Quantity take-off

  • CS-03 · Order lists per phase

  • RFQ packages per subcontractorCS-04 · PDF document · A4
  • CS-05 · Payment schedule and cash flow

  • CS-06 · Self-build variant

  • CS-07 · Provisional sums and options

  • CS-08 · Cost indicators

CTPlanning & execution· 4

  • CT-01 · Schedule

  • CT-02 · Inspection points and acceptance

  • CT-03 · Deliveries and lead times

  • CT-04 · Site logistics

BSSpecification· 1

HBBuild guide· 1