Skip to content
The service is in beta: the free concept is available; paid packages are offered by individual quote.
archi.sulerr

How it works

Four phases. AI does the heavy drafting; our engineer reviews every result. An architect's signature is an optional add-on. You stay in control at every step.

  1. Brief intake

    You describe the plot, the building and your priorities.

    ≈10–15 minclient

    AI does

    • Check the form in real time.
    • Suggest sensible defaults from the selected jurisdiction (building code, units, energy targets).

    Humans do

    • You fill out the form yourself; no architect is involved at this stage.
    • You can save and return — no payment is taken before the working draft is shown.
  2. AI working draft

    Automated generation of a structured first draft.

    ≤24 h (internal)AI

    AI does

    • Generate the requested sections (executive summary, area breakdown, code-compliance notes, indicative energy and cost ranges).
    • Cite the relevant clauses of the local building code in every section.
    • Run an automatic structure check and a banned-claims check on the output.

    Humans do

    • Nothing in this phase — the output is flagged as a draft.
    • The draft is stored internally and never sent to any authority, lender or insurer.

    Working draftthis output is a working draft only — not project documentation, not legally binding, never submitted to a competent authority.

  3. Engineer review

    An in-house engineer reads the AI output and corrects it.

    within the 3 working daysengineer · in-house

    AI does

    • Surface structure-check issues and banned-claim matches to the engineer.
    • No new content is generated in this phase.

    Humans do

    • The engineer cross-checks every numeric claim against the source code.
    • Unclear or speculative passages are rewritten or removed.
    • If the case is out of scope (heritage, complex structure, non-standard plot) the engineer escalates or refuses.
  4. Architect signature (optional)

    Where available, a registered partner architect reviews and either signs or rejects.

    on requestpartner architect (optional)

    AI does

    • Nothing — the architect makes the decision on their professional responsibility.
    • The system logs the architect's name, registration number and date of signature.

    Humans do

    • The partner architect verifies plot-specific feasibility on site or from documents.
    • If the signature add-on is ordered, the architect signs the deliverable under their registration — only then is it a signed document.
    • If the architect refuses, you receive written revision notes and a full refund of the architect-fee portion.

    Level 2 add-onPhase 4 is an optional add-on to the permit package, offered only where a signature is legally needed and a partner is available (NL: not required by law; UA, PL, DE: waiting list). Level 0 and Level 1 outputs remain unsigned after engineer review and are clearly marked as such.

Every result is reviewed by our engineer (phase 3) before you see it. Phase 4 — signature by a partner architect — is an optional add-on, offered only where it is legally needed and a partner is available. The AI draft is never submitted to any authority.

Free: what your municipality expects in a complete residential-permit submission

One-page editorial reference per jurisdiction (NL, UA, PL, DE). Drawings, calculations, supporting documents, typical fees and the reasons offices reject. One click, no email gate.

Editorial reference. The legally binding answer for your project comes from your municipality and the qualified professionals you appoint to prepare and submit it.

What a Level 0 brief looks like end-to-end

Below is the full sample brief used in the landing-page teaser, with every section expanded — narrative, scope checklist, timeline and cost band.

archi.sulerr.com

Sample Level 0 brief

SampleGenerated: 2026-05-12 09:14

Family X — Almere

Detached family house, BENG-ready, 120 m² over two storeys

Jurisdiction
NL
Area
120 m²
Plot
320 m²
Floors
2
Energy
A++
Bedrooms
4
AI narrative
Site context
AI confidence: 86%

The 320 m² plot sits in a semi-urban Almere block with predominantly two-storey detached neighbours. The southern setback (3 m) and the protected oak on the north boundary anchor the building footprint to the central two-thirds of the plot. The dwelling is positioned to keep the oak's drip-line uncompromised and to capture south-west afternoon light into the main living volume.

Volumetric concept
AI confidence: 81%

A compact two-storey volume with a low-pitch (10°) saddle roof, optimised for a south-facing PV array. Ground floor: open kitchen-living-dining (≈42 m²), home office (≈10 m²), entrance hall, WC and technical room. Upper floor: master suite with en-suite (≈22 m²), three further bedrooms (10–14 m² each), shared bathroom. The footprint stays within the standard NL plot-coverage ratio (Bouwbesluit / local bestemmingsplan to be confirmed).

Energy strategy
AI confidence: 78%

Envelope: Rc ≥ 4.7 m²·K/W (façade), Rc ≥ 6.3 m²·K/W (roof), triple-glazing U ≤ 1.0 W/m²·K. Air-tightness target qv;10 ≤ 0.4 dm³/(s·m²). Air-source heat pump (≈8 kW nominal) feeding low-temperature underfloor heating; balanced MV-HR with ≥ 92 % heat-recovery efficiency. Roof prepared for ≈ 4.0 kWp PV. Indicative BENG-1: ≤ 55 kWh/m²·year — to be verified by formal BENG calculation in Level 1+.

Permit-package scope
AI confidence: 74%

For a Dutch new-build of this scale the omgevingsvergunning (Omgevingswet, in force since 1 Jan 2024) typically bundles the activities Bouwen, Slopen and (where applicable) Kappen. The drawing set below is the minimum the municipality of Almere expects for the bouwen-component; the cost schedule and construction timeline are advisory at Level 0 and are refined in the Level 1 and Level 2 packages after engineer review.

Scope checklist
8 / 14 drafted
  • Site plan with setbacks and tree retention (1:200)
  • Floor plans, ground & first floor (1:100)
  • Roof plan with PV array layout (1:100)
  • Facades — N, E, S, W (1:100)
  • Building sections — A-A and B-B (1:50)
  • Detailed wall section incl. thermal bridges (1:20)
  • Foundation plan with sondering reference
  • Structural calculation note (NEN-EN 1990 series)
  • BENG calculation memo (provisional)
  • MV-HR scheme with duct routing
  • Electrical single-line + lighting plan
  • Plumbing riser + hot-water layout
  • Indicative cost schedule by trade
  • Construction timeline (Gantt, weeks)
Indicative timeline

10 working days

  1. 01AI working draft (internal step)1 d
  2. 02In-house engineer review2 d
  3. 03Client revisions cycle4 d
  4. 04Final delivery of the pre-design package3 d
Indicative cost band

€288,000 – €336,000

2400–2800 EUR/m²

Construction only, exclusive of VAT, plot, financing and external works.

Open data gaps

Confidence is constrained by two open data gaps: the local bestemmingsplan has not been pulled, and there is no soil survey (sondering) yet. Both are required before any number on this page is treated as binding.

  • Local bestemmingsplan / Omgevingsplan rules for the specific cadastral parcel.
  • Soil survey (sondering) — needed to confirm foundation type and pile depth.
  • Confirmed DB-Geo / archaeological screening for the immediate plot.
  • Verified PV / heat-pump supplier quotes for the cost band.

SampleSample output. The figures, layouts and code references on this page are illustrative — they describe a fictional commission for an imagined family in Almere and are not advice for any specific plot. A real Level 0 brief is generated from your own inputs and is reviewed by an in-house engineer before you ever see a number we treat as binding. This sample is not a signed document; the signature of a registered architect is an optional add-on, offered by country.

What AI does · what humans do

We are explicit about the AI/human split — it's a regulatory requirement and a question of trust.

Done by AI

  • Executive summary and area breakdown
  • Drafting compliance checks against the local building code
  • Drafting energy-performance estimates
  • Cost-range and material estimate (informational)

Done by humans

  • Engineer cross-checks the AI output
  • Engineer flags plot-specific feasibility questions; unclear cases are escalated or declined
  • Where the signature add-on is ordered and available, a partner architect signs on their own registration
  • DPO handles GDPR requests within 30 days