Skip to content
The service is in beta: the free concept is available; paid packages are offered by individual quote.
archi.sulerr

Pricing

Four levels, four outcomes. Pick the stage that matches where you are today; you can always start free with Level 0 and upgrade later. Final price depends on plot size and project complexity; the figures shown are published entry-level prices.

00 ·T0Level 0

Concept

Free

3 working days

Who this is for

First-time visitors who want to see what we'd actually deliver before paying for anything — and who need a quick sanity-check on whether their project is realistic.

What you get

  • AI draft of your project, based on your brief and reviewed by our engineer before you see it
  • Indicative room programme with areas in m²
  • Local building-code compliance preview (Bbl / ДБН / WT / GEG)
  • Indicative cost range, before commitment

What is NOT included

  • Informational only — not a signed document, you cannot file this
  • No permit-grade drawings or technical reports

Logical next step

Level 1 if you want a pre-design package for talks with the municipality, your bank or a contractor.

Free, no card required, delivered within 3 working days.

01 ·T1Level 1

Pre-design package

from €890.00

10 working days

Who this is for

Owners ready to talk to the municipality (vooroverleg), a bank, a contractor or their own architect — but not yet ready to file a permit application.

What you get

  • Everything in Level 0
  • Floor plans 1:100, elevations, a section and a site plan
  • 3D massing model, volume and area report
  • Code pre-check with article references, and a cost corridor

What is NOT included

  • Unsigned — no architect signature
  • Not yet a permit package — no full structural or MEP package

Logical next step

Level 2 once you decide to apply for the building permit.

10 working days. A pre-design package, not the final permit set.

03 ·T3Level 3

Working drawings

from €6,900

30–50 working days

Who this is for

Owners who are ready to build and need drawings a contractor can build from.

What you get

  • Everything in Level 2
  • Working drawings: architectural (AR) and construction details (CD)
  • Electrical (EL), plumbing (PL) and heating & ventilation (HV) drawings
  • Cost schedule (CS) and construction timeline (CT)

What is NOT included

  • Structural calculation is done separately by a structural engineer
  • No on-site supervision — see the Construction support add-on

Logical next step

Add the monthly Construction support once building starts.

30–50 working days.

Prices shown are entry-level ("from"). The final quote is calculated after we review your brief, and you confirm in writing before any payment is taken.

What is included in every paid level

Local building-code compliance

Bbl (NL) · ДБН (UA) · WT (PL) · GEG (DE). The applied edition is the one in force on the day you submitted your brief — locked in writing.

Engineer review

Every paid deliverable is reviewed by our in-house engineer before you receive it. The signature of a partner architect is an optional add-on, available once a partner is confirmed in your country.

AI / human split, in writing

Every artefact carries the AI-content notice required by the EU AI Act and equivalent laws — what AI did and what people did, side by side.

GDPR self-service

Export or erase your data from /lk/data at any time — including the prompt and response history we hold about your project.

Audit trail

We retain the full prompt and response history of your project for the statutory archival period set by your jurisdiction.

Liability terms in writing

Liability is set out in the Service Agreement (/legal/offer). If you order the architect-signature add-on, the signing architect's professional indemnity details are shown before you pay.

Pricing & levels

Is Level 0 really free?
Yes. You get one free concept per email per quarter; no payment details required.
What's included in Level 1?
Level 0 deliverables plus floor plans 1:100, elevations, a section, a site plan, 3D massing, a volume and area report, a code pre-check with article references and a cost corridor. Unsigned.
What's included in Level 2?
Permit-package drawings (AR, CD, MEP outline) and the energy-performance compliance file, architect-ready. Unsigned in the base version; the signature of a partner architect is an optional add-on where available.
How does Construction support work?
It is a separate monthly add-on, not a level: up to 4 revisions per month, written reports and a hand-over checklist; we reply to a change request within 2 working days. Pause or cancel any time; pro-rata refund on cancellation.
Refund policy?
EU consumers have a 14-day right of withdrawal (Directive 2011/83/EU), unless performance has begun with their express prior consent. If the engineer review finds a scope mismatch that we did not catch up-front, you receive a full refund within 14 days. If the package fails permit submission for a fixable reason within 30 days of delivery, we revise it at no extra cost (and re-sign it if you ordered the signature add-on) or refund the architect sign-off fee. Changes you make yourself after delivery are not covered. For consumers in Ukraine: refund per ЗУ «Про захист прав споживачів».