Skip to content
The service is in beta: the free concept is available; paid packages are offered by individual quote.
archi.sulerr

AI-assisted vs traditional architect bureau

Faster turnaround. Pricing published up front. A signature is not included by default — it is an optional add-on where available. Below — a row-by-row comparison for each of the four jurisdictions we cover.

Compare for

What changes — and what does not — when AI prepares the working draft and our engineer reviews it. An architect's signature is an optional add-on.

NL
WhatTraditional architect bureauarchi.sulerr.com (Levels 0–2)
Time to first working draftFrom a signed engagement to something concrete you can react to.6–10 weeks after the kick-off meetingEngineer-reviewed concept within 3 working days of submitting the brief
Time to permit-ready packageFrom engagement to a permit package ready for an architect or for submission.4–6 months total, dependent on bureau workload20–30 working days to an architect-ready Level 2 package
Cost band (permit-ready)Indicative end-to-end fee for an average single-family house, incl. VAT. The traditional-bureau figures are our own rough estimate.approx. €8,000–€14,000 incl. BTW for a typical permit package (our rough estimate)€3,900–€7,900 incl. BTW — Level 2, depending on floor area
Up-front commitmentConsultation hours, deposit, or paperwork required before you see anything.2–4 paid consultation hours and a 25–40% deposit before any drawingFree Level 0 concept — no card, no deposit, no consultation hours
Transparency on pricing & scopeWhether you can see the price and the scope publicly, before contacting anyone.Quote on request; rates and scope rarely published onlineLevel prices published on /pricing; final quote in writing before payment
Revision-cycle costWhat it costs you when you change your mind mid-project.€90–€150 per hour, charged per changeUp to 3 free revision rounds per level; further rounds at a published flat rate
Architect sign-offWho carries professional liability and signs the final document.Yes — bureau lead architect, entered in the ArchitectenregisterNot required by law for an omgevingsvergunning; a partner architect's signature is an optional add-on once a partner is confirmed
Local jurisdiction expertiseKnowledge of the local building code (Bbl / ДБН / WT / GEG) and municipal practice.High — bureau-resident architect; Bbl + OmgevingsplanBbl + BENG + Omgevingsplan covered; every result engineer-reviewed
Best-fit project sizeWhere each model is at its strongest.Mid- to large single-family, multi-family, commercialSmall to mid single-family (40–400 m²); not for commercial / >12-unit residential
What you get within 3 working daysConcrete artefact in your hands within the first working days after engaging.Signed engagement letter and a planned kick-off dateEngineer-reviewed Level 0 concept: areas, code-compliance preview, indicative cost band
What you get on day 14Concrete artefact in your hands two weeks after engaging.First sketch concept, usually on paper, after the kick-off meetingLevel 1 pre-design package (10 working days): plans, elevations, section, 3D massing, code pre-check — unsigned
UA
WhatTraditional architect bureauarchi.sulerr.com (Levels 0–2)
Time to first working draftFrom a signed engagement to something concrete you can react to.4–8 weeks after kick-off, depending on workloadEngineer-reviewed concept within 3 working days of submitting the brief
Time to permit-ready packageFrom engagement to a permit package ready for an architect or for submission.3–5 months total20–30 working days to an architect-ready Level 2 package
Cost band (permit-ready)Indicative end-to-end fee for an average single-family house, incl. VAT. The traditional-bureau figures are our own rough estimate.approx. ₴180,000–₴320,000 for a typical permit package (our rough estimate)₴75,000–₴160,000 — Level 2, depending on floor area
Up-front commitmentConsultation hours, deposit, or paperwork required before you see anything.Several paid consultation hours and a 30–50% depositFree Level 0 — no deposit, no card
Transparency on pricing & scopeWhether you can see the price and the scope publicly, before contacting anyone.Quotes on request; published rates are rareLevel prices published on /pricing; final quote in writing first
Revision-cycle costWhat it costs you when you change your mind mid-project.₴1,500–₴2,500 per hour, charged per changeUp to 3 free revision rounds per level; further rounds at a flat rate
Architect sign-offWho carries professional liability and signs the final document.Yes — bureau architect holding a кваліфікаційний сертифікатOptional add-on; waiting list until a partner architect is confirmed
Local jurisdiction expertiseKnowledge of the local building code (Bbl / ДБН / WT / GEG) and municipal practice.High — bureau architect; ДБН V.2.2-15, fire safety ДБН V.1.1-7ДБН V.2.2-15, V.1.1-7 covered; every result engineer-reviewed
Best-fit project sizeWhere each model is at its strongest.Mid to large single-family, multi-familySmall to mid single-family (40–400 m²); not for commercial
What you get within 3 working daysConcrete artefact in your hands within the first working days after engaging.Signed contract, kick-off date scheduledEngineer-reviewed Level 0 concept: areas, ДБН-compliance preview, indicative cost band
What you get on day 14Concrete artefact in your hands two weeks after engaging.Initial concept sketch after kick-offLevel 1 pre-design package (10 working days): plans, elevations, section, 3D massing, code pre-check — unsigned
PL
WhatTraditional architect bureauarchi.sulerr.com (Levels 0–2)
Time to first working draftFrom a signed engagement to something concrete you can react to.5–10 weeks from kick-offEngineer-reviewed concept within 3 working days of submitting the brief
Time to permit-ready packageFrom engagement to a permit package ready for an architect or for submission.4–6 months total20–30 working days to an architect-ready Level 2 package
Cost band (permit-ready)Indicative end-to-end fee for an average single-family house, incl. VAT. The traditional-bureau figures are our own rough estimate.approx. zł 25,000–zł 50,000 for a typical permit package (our rough estimate)zł 12,000–zł 25,000 incl. VAT — Level 2, depending on floor area
Up-front commitmentConsultation hours, deposit, or paperwork required before you see anything.Paid consultation hours and a 25–40% depositFree Level 0 — no deposit, no card
Transparency on pricing & scopeWhether you can see the price and the scope publicly, before contacting anyone.Quotes on request; published rates are rareLevel prices published on /pricing; written quote before payment
Revision-cycle costWhat it costs you when you change your mind mid-project.zł 250–zł 400 per hour, per changeUp to 3 free revision rounds per level; further rounds at a flat rate
Architect sign-offWho carries professional liability and signs the final document.Yes — bureau architect, IARP memberOptional add-on; waiting list until a partner architect is confirmed
Local jurisdiction expertiseKnowledge of the local building code (Bbl / ДБН / WT / GEG) and municipal practice.High — bureau architect; WT 2021 + Prawo budowlaneWT 2021 + Prawo budowlane covered; every result engineer-reviewed
Best-fit project sizeWhere each model is at its strongest.Mid to large single-family, multi-family, commercialSmall to mid single-family (40–400 m²); not for commercial
What you get within 3 working daysConcrete artefact in your hands within the first working days after engaging.Signed contract, kick-off scheduledEngineer-reviewed Level 0 concept: areas, WT-compliance preview, indicative cost band
What you get on day 14Concrete artefact in your hands two weeks after engaging.Initial concept sketch after kick-offLevel 1 pre-design package (10 working days): plans, elevations, section, 3D massing, code pre-check — unsigned
DE
WhatTraditional architect bureauarchi.sulerr.com (Levels 0–2)
Time to first working draftFrom a signed engagement to something concrete you can react to.6–12 weeks after the AuftragEngineer-reviewed concept within 3 working days of submitting the brief
Time to permit-ready packageFrom engagement to a permit package ready for an architect or for submission.5–7 months for a Bauantrag-ready set20–30 working days to an architect-ready Level 2 package
Cost band (permit-ready)Indicative end-to-end fee for an average single-family house, incl. VAT. The traditional-bureau figures are our own rough estimate.approx. €10,000–€18,000 incl. MwSt. for a typical permit package (our rough estimate)€4,900–€9,900 incl. MwSt. — Level 2, depending on floor area
Up-front commitmentConsultation hours, deposit, or paperwork required before you see anything.Paid Vorgespräche and a HOAI-staged advanceFree Level 0 — no deposit, no card, no Vorgespräch
Transparency on pricing & scopeWhether you can see the price and the scope publicly, before contacting anyone.Fees often anchored to HOAI table; full scope discussed bilaterallyLevel prices published on /pricing; written quote before payment
Revision-cycle costWhat it costs you when you change your mind mid-project.€100–€160 per hour, per changeUp to 3 free revision rounds per level; further rounds at a flat rate
Architect sign-offWho carries professional liability and signs the final document.Yes — bureau architect, Architektenkammer-registeredOptional add-on (bauvorlageberechtigter partner); waiting list until a partner is confirmed
Local jurisdiction expertiseKnowledge of the local building code (Bbl / ДБН / WT / GEG) and municipal practice.High — bureau architect; GEG + LandesbauordnungGEG + Landesbauordnung covered; every result engineer-reviewed
Best-fit project sizeWhere each model is at its strongest.Mid to large single-family, multi-family, commercialSmall to mid Einfamilienhaus (40–400 m²); not for commercial or >12-unit
What you get within 3 working daysConcrete artefact in your hands within the first working days after engaging.Signed Vertrag, kick-off dateEngineer-reviewed Level 0 concept: areas, GEG-compliance preview, indicative cost band
What you get on day 14Concrete artefact in your hands two weeks after engaging.Initial Vorentwurf after the VorgesprächLevel 1 pre-design package (10 working days): plans, elevations, section, 3D massing, code pre-check — unsigned

What we are not

Honest about boundaries — better than over-promising. Five things we deliberately do not do.

  1. 1We are not a structural engineer. Eurocode signatures (NEN-EN 1990 / DIN EN 1990 / EN 1990-PN / ДБН EN 1990) stay with a registered Constructeur or structural engineer.
  2. 2We do not act as site manager. The formal site-management role (Bouwbegeleiding / Bauleitung / kierownik budowy / технічний нагляд) remains with you or your contractor; our monthly Construction support add-on covers revisions, written reports and a hand-over checklist.
  3. 3Complex commercial, industrial, or multi-family residential above 12 units is out of scope for Levels 0–2.
  4. 4Estimates are indicative — they are not a binding cost.
  5. 5We do not replace local-government pre-permit consultation (omgevingsoverleg / Bauvoranfrage / wniosek o warunki zabudowy) for unusual sites — those are commissioned separately.

Free: what your municipality expects in a complete residential-permit submission

One-page editorial reference per jurisdiction (NL, UA, PL, DE). Drawings, calculations, supporting documents, typical fees and the reasons offices reject. One click, no email gate.

Editorial reference. The legally binding answer for your project comes from your municipality and the qualified professionals you appoint to prepare and submit it.

Ready to compare on your own brief?

Level 0 is free, no card needed. The reviewed concept reaches you within 3 working days.