archi.sulerr

AI-assisted vs traditional architect bureau

Same legal status. Faster turnaround. Pricing published up front. Below — a row-by-row comparison for each of the four jurisdictions we cover.

Compare for

What changes — and what does not — when AI prepares the working draft and a registered architect signs the final document.

NL
WhatTraditional architect bureauarchi.sulerr.com (Tier 0–2)
Time to first working draftFrom a signed engagement to something concrete you can react to.6–10 weeks after the kick-off meetingAI working draft within 24 hours of submitting the brief
Time to permit-ready packageFrom engagement to a signed package you can submit to the local authority.4–6 months total, dependent on bureau workload2–4 weeks to a signed Tier 2 package
Cost band (permit-ready)Indicative end-to-end fee for an average single-family house, incl. VAT.€8,000–€14,000 incl. BTW for a typical permit package€1,500–€3,000 incl. BTW for a Tier 2 permit package
Up-front commitmentConsultation hours, deposit, or paperwork required before you see anything.2–4 paid consultation hours and a 25–40% deposit before any drawingFree Tier 0 concept — no card, no deposit, no consultation hours
Transparency on pricing & scopeWhether you can see the price and the scope publicly, before contacting anyone.Quote on request; rates and scope rarely published onlineTier prices published on /pricing; final quote in writing before payment
Revision-cycle costWhat it costs you when you change your mind mid-project.€90–€150 per hour, charged per changeUp to 3 free revision rounds per tier; further rounds at a published flat rate
Architect sign-offWho carries professional liability and signs the final document.Yes — bureau lead architect, SBA-registeredYes — partner SBA-registered architect signs Tier 2 deliverables
Local jurisdiction expertiseKnowledge of the local building code (Bbl / ДБН / WT / GEG) and municipal practice.High — bureau-resident SBA architect; Bbl + OmgevingsplanBbl + BENG + Omgevingsplan covered; partner architect signs only what they verify
Best-fit project sizeWhere each model is at its strongest.Mid- to large single-family, multi-family, commercialSmall to mid single-family (40–400 m²); not for commercial / >12-unit residential
What you get on day 1Concrete artefact in your hands twenty-four hours after engaging.Signed engagement letter and a planned kick-off dateAI working draft (Tier 0): areas, code-compliance preview, indicative cost band
What you get on day 14Concrete artefact in your hands two weeks after engaging.First sketch concept, usually on paper, after the kick-off meetingEngineer-reviewed Tier 1 sketch with architect's sketch sign-off (PDF)
UA
WhatTraditional architect bureauarchi.sulerr.com (Tier 0–2)
Time to first working draftFrom a signed engagement to something concrete you can react to.4–8 weeks after kick-off, depending on workloadAI working draft within 24 hours
Time to permit-ready packageFrom engagement to a signed package you can submit to the local authority.3–5 months total2–4 weeks to Tier 2 package signed by a НААУ-registered architect
Cost band (permit-ready)Indicative end-to-end fee for an average single-family house, incl. VAT.₴180,000–₴320,000 for a typical permit package₴35,000–₴75,000 for a Tier 2 permit package
Up-front commitmentConsultation hours, deposit, or paperwork required before you see anything.Several paid consultation hours and a 30–50% depositFree Tier 0 — no deposit, no card
Transparency on pricing & scopeWhether you can see the price and the scope publicly, before contacting anyone.Quotes on request; published rates are rareTier prices published on /pricing; final quote in writing first
Revision-cycle costWhat it costs you when you change your mind mid-project.₴1,500–₴2,500 per hour, charged per changeUp to 3 free revision rounds per tier; further rounds at a flat rate
Architect sign-offWho carries professional liability and signs the final document.Yes — bureau architect, registered with НААУYes — partner architect registered with НААУ signs Tier 2 deliverables
Local jurisdiction expertiseKnowledge of the local building code (Bbl / ДБН / WT / GEG) and municipal practice.High — bureau architect; ДБН V.2.2-15, fire safety ДБН V.1.1-7ДБН V.2.2-15, V.1.1-7 covered; partner architect signs only verified content
Best-fit project sizeWhere each model is at its strongest.Mid to large single-family, multi-familySmall to mid single-family (40–400 m²); not for commercial
What you get on day 1Concrete artefact in your hands twenty-four hours after engaging.Signed contract, kick-off date scheduledAI working draft (Tier 0): areas, ДБН-compliance preview, indicative cost band
What you get on day 14Concrete artefact in your hands two weeks after engaging.Initial concept sketch after kick-offEngineer-reviewed Tier 1 sketch with architect's sketch sign-off (PDF)
PL
WhatTraditional architect bureauarchi.sulerr.com (Tier 0–2)
Time to first working draftFrom a signed engagement to something concrete you can react to.5–10 weeks from kick-offAI working draft within 24 hours
Time to permit-ready packageFrom engagement to a signed package you can submit to the local authority.4–6 months total2–4 weeks to a Tier 2 package signed by an IARP architect
Cost band (permit-ready)Indicative end-to-end fee for an average single-family house, incl. VAT.zł 25,000–zł 50,000 for a typical permit packagezł 7,000–zł 14,000 for a Tier 2 permit package
Up-front commitmentConsultation hours, deposit, or paperwork required before you see anything.Paid consultation hours and a 25–40% depositFree Tier 0 — no deposit, no card
Transparency on pricing & scopeWhether you can see the price and the scope publicly, before contacting anyone.Quotes on request; published rates are rareTier prices published on /pricing; written quote before payment
Revision-cycle costWhat it costs you when you change your mind mid-project.zł 250–zł 400 per hour, per changeUp to 3 free revision rounds per tier; further rounds at a flat rate
Architect sign-offWho carries professional liability and signs the final document.Yes — bureau architect, IARP-registeredYes — partner IARP-registered architect signs Tier 2 deliverables
Local jurisdiction expertiseKnowledge of the local building code (Bbl / ДБН / WT / GEG) and municipal practice.High — bureau architect; WT 2021 + Prawo budowlaneWT 2021 + Prawo budowlane covered; partner architect signs only verified content
Best-fit project sizeWhere each model is at its strongest.Mid to large single-family, multi-family, commercialSmall to mid single-family (40–400 m²); not for commercial
What you get on day 1Concrete artefact in your hands twenty-four hours after engaging.Signed contract, kick-off scheduledAI working draft (Tier 0): areas, WT-compliance preview, indicative cost band
What you get on day 14Concrete artefact in your hands two weeks after engaging.Initial concept sketch after kick-offEngineer-reviewed Tier 1 sketch with architect's sketch sign-off (PDF)
DE
WhatTraditional architect bureauarchi.sulerr.com (Tier 0–2)
Time to first working draftFrom a signed engagement to something concrete you can react to.6–12 weeks after the AuftragAI working draft within 24 hours
Time to permit-ready packageFrom engagement to a signed package you can submit to the local authority.5–7 months for a Bauantrag-ready set2–4 weeks to a Tier 2 package signed by an Architektenkammer architect
Cost band (permit-ready)Indicative end-to-end fee for an average single-family house, incl. VAT.€10,000–€18,000 incl. MwSt. for a typical permit package€1,800–€3,500 incl. MwSt. for a Tier 2 permit package
Up-front commitmentConsultation hours, deposit, or paperwork required before you see anything.Paid Vorgespräche and a HOAI-staged advanceFree Tier 0 — no deposit, no card, no Vorgespräch
Transparency on pricing & scopeWhether you can see the price and the scope publicly, before contacting anyone.Fees often anchored to HOAI table; full scope discussed bilaterallyTier prices published on /pricing; written quote before payment
Revision-cycle costWhat it costs you when you change your mind mid-project.€100–€160 per hour, per changeUp to 3 free revision rounds per tier; further rounds at a flat rate
Architect sign-offWho carries professional liability and signs the final document.Yes — bureau architect, Architektenkammer-registeredYes — partner Architektenkammer-registered architect signs Tier 2 deliverables
Local jurisdiction expertiseKnowledge of the local building code (Bbl / ДБН / WT / GEG) and municipal practice.High — bureau architect; GEG + LandesbauordnungGEG + Landesbauordnung covered; partner architect signs only verified content
Best-fit project sizeWhere each model is at its strongest.Mid to large single-family, multi-family, commercialSmall to mid Einfamilienhaus (40–400 m²); not for commercial or >12-unit
What you get on day 1Concrete artefact in your hands twenty-four hours after engaging.Signed Vertrag, kick-off dateAI working draft (Tier 0): areas, GEG-compliance preview, indicative cost band
What you get on day 14Concrete artefact in your hands two weeks after engaging.Initial Vorentwurf after the VorgesprächEngineer-reviewed Tier 1 sketch with architect's sketch sign-off (PDF)

What we are not

Honest about boundaries — better than over-promising. Five things we deliberately do not do.

  1. 1We are not a structural engineer. Eurocode signatures (NEN-EN 1990 / DIN EN 1990 / EN 1990-PN / ДБН EN 1990) stay with a registered Constructeur or structural engineer.
  2. 2We do not supervise the build site. Bouwbegeleiding / Bauleitung / kierownik budowy / технічний нагляд remains with you or your contractor.
  3. 3Complex commercial, industrial, or multi-family residential above 12 units is out of scope for Tier 0–2.
  4. 4Estimates are indicative until Tier 2 architect sign-off — they are not a binding cost.
  5. 5We do not replace local-government pre-permit consultation (omgevingsoverleg / Bauvoranfrage / wniosek o warunki zabudowy) for unusual sites — those are commissioned separately.

Ready to compare on your own brief?

Tier 0 is free, no card needed. The AI working draft lands in your inbox within 24 hours.