Office or commercial fit-out

Coming soon

Who it is for

For anyone fitting out or converting an office or commercial space.

Coming soon: this package cannot be ordered yet. The list below is the planned composition; every document is marked «planned». There is no price and no delivery time yet.

The planned composition in numbers

Drawings and diagrams
23
Schedules and calculations
42
Documents
39
3D model
0
Total
104

Three sets from the same package

Everyone gets only the documents meant for them.

  • For the crew

    What the crew needs on site: drawings, details and the work description.

    54 planned documents

    1 structural documents (the request package for the structural engineer) join the crew set only after the engineer has confirmed them. Until then: Indicative, not for construction.

    Show the list
    • AL-02 List of documents and drawings
    • AL-03 Status statement and reading guide
    • AL-06 Change log per revision
    • AL-07 Contact list of project parties
    • AL-09 Demarcation list
    • LO-07 Asbestos inventory report
    • LO-08 Drawings of the existing situation
    • AR-17 Door schedule
    • AR-19 Finishes schedule
    • AR-21 Fire safety
    • AR-24 Open items register
    • AR-25 Floor and ceiling plans
    • AR-31 Working plans 1:50
    • AR-33 Overview of wall types
    • AR-34 Door hardware schedule
    • AR-37 Tile layout plan
    • AR-39 Colour and materials schedule
    • EL-11 Lighting plan and switching diagrams
    • EL-12 Low-voltage and data
    • EL-13 Smoke detectors and emergency lighting
    • EL-17 Survey of the existing electrical installation
    • WR-12 Survey of existing pipes
    • HV-15 Office climate and ventilation system
    • VH-02 Health and safety plan, construction phase
    • VH-05 Site rules and emergency plan
    • VH-06 Dust and asbestos control
    • CT-01 Schedule
    • CT-03 Deliveries and lead times
    • CT-05 Work plan per phase
    • CT-06 Waste and skip plan
    • CT-09 Daily and weekly report
    • CT-12 Protection and covering plan
    • CS-28 Purchase list with supplier and stock
    • BS Specification
    • BS-02 Manufacturers' installation instructions
    • KW-01 Inspection plan per building phase
    • KW-02 Inspection forms
    • KW-06 Screed moisture measurement
    • OP-01 Pre-inspection and snagging list
    • R-01 Measured plan of the existing situation
    • R-02 Room schedule with dimensions and quantities
    • R-03 Demolition and partition plan
    • R-04 Scope of work per room
    • R-05 Electrics per room
    • R-06 Plumbing and heating per room
    • R-07 Wall elevations of wet rooms
    • R-08 Materials schedule in purchasing units
    • R-09 Hours per trade and schedule
    • R-13 Restoring fire and sound separations
    • O-01 Partition and door plan
    • O-02 Ceiling and lighting plan
    • O-03 Floor finish plan
    • O-04 Electrics, data and workstations
    • O-05 Ventilation and fire safety
  • For the contractor (estimating and purchasing)

    Quantities, order lists, schedules for price requests and the programme.

    61 planned documents

    Show the list
    • AL-01 Cover sheet and project data
    • AL-02 List of documents and drawings
    • AL-03 Status statement and reading guide
    • AL-04 Starting points and client brief
    • AL-05 Register of conditional items
    • AL-06 Change log per revision
    • AL-07 Contact list of project parties
    • AL-09 Demarcation list
    • LO-02 Check against the zoning plan
    • LO-09 Photo report of existing state and neighbours
    • LO-10 Structural survey of the existing building
    • LO-11 Municipal archive drawings
    • LO-16 VvE consent and division rules
    • LO-17 Landlord consent and hand-back condition
    • AR-15 Room schedule NEN 2580
    • AR-17 Door schedule
    • AR-19 Finishes schedule
    • AR-24 Open items register
    • AR-34 Door hardware schedule
    • AR-39 Colour and materials schedule
    • EL-17 Survey of the existing electrical installation
    • WR-12 Survey of existing pipes
    • VG-01 Permit check (Omgevingsloket)
    • VH-01 Health and safety plan, design phase
    • VH-02 Health and safety plan, construction phase
    • CT-01 Schedule
    • CT-03 Deliveries and lead times
    • CT-08 Overview of subcontractors and suppliers
    • CT-09 Daily and weekly report
    • CT-10 Minutes of the site meeting
    • CS-05 Payment schedule and cash flow
    • CS-07 Provisional sums and options
    • CS-21 Internal working budget
    • CS-22 Surcharges and profit
    • CS-23 Rates sheet per trade
    • CS-25 Budget check and justification
    • CS-26 Labour budget per trade and phase
    • CS-27 Price and source register
    • CS-28 Purchase list with supplier and stock
    • CS-29 Additional and omitted work statement
    • CS-31 Comparison of subcontractor quotations
    • CS-32 VAT check per line
    • CS-34 Post-calculation
    • BS Specification
    • BS-03 Quality and performance declarations
    • KW-01 Inspection plan per building phase
    • KW-03 Photo file of inspection points
    • KW-04 Delivery notes and certificates
    • KW-05 Deviation register
    • OP-01 Pre-inspection and snagging list
    • OP-02 Handover report
    • OP-07 Handover of keys and meter readings
    • CO-01 Building contract
    • CO-02 General terms and conditions
    • CO-03 Proof of insurance
    • R-02 Room schedule with dimensions and quantities
    • R-08 Materials schedule in purchasing units
    • R-09 Hours per trade and schedule
    • R-10 Register of unknowns
    • R-11 Photo list before start
    • O-06 Occupancy and workstation plan
  • For the client

    Overview, choices, payment schedule and the documents you keep.

    37 planned documents

    Show the list
    • AL-01 Cover sheet and project data
    • AL-02 List of documents and drawings
    • AL-03 Status statement and reading guide
    • AL-04 Starting points and client brief
    • AL-05 Register of conditional items
    • AL-06 Change log per revision
    • AL-09 Demarcation list
    • LO-09 Photo report of existing state and neighbours
    • LO-16 VvE consent and division rules
    • LO-17 Landlord consent and hand-back condition
    • AR-19 Finishes schedule
    • AR-24 Open items register
    • AR-39 Colour and materials schedule
    • AR-41 Furnishing plan
    • EL-11 Lighting plan and switching diagrams
    • EL-15 Circuit list and installation diagram at handover
    • EL-16 First inspection report NEN 1010
    • VG-01 Permit check (Omgevingsloket)
    • CT-01 Schedule
    • CT-10 Minutes of the site meeting
    • CT-11 Letter to residents and neighbours
    • CS-05 Payment schedule and cash flow
    • CS-07 Provisional sums and options
    • CS-24 Quotation for the client
    • CS-25 Budget check and justification
    • CS-29 Additional and omitted work statement
    • BS Specification
    • OP-01 Pre-inspection and snagging list
    • OP-02 Handover report
    • OP-03 As-built drawings
    • OP-05 Operating and maintenance instructions
    • OP-06 Warranty statements
    • OP-07 Handover of keys and meter readings
    • CO-01 Building contract
    • CO-02 General terms and conditions
    • CO-03 Proof of insurance
    • R-10 Register of unknowns

All documents by section

For each document: kind, file format, status and when it is needed.

10Safety

CodeDocumentKindFormatStatusWhen
VH-01Health and safety plan, design phaserisks arising from the designDocumentpdfPlannedAlways
VH-02Health and safety plan, construction phaseproject-specific risks and measuresDocumentpdfPlannedAlways
VH-05Site rules and emergency planaccess, protective equipment, first aid, emergency numbersDocumentpdfPlannedAlways
VH-06Dust and asbestos controlworking method during demolition: extraction and screeningDocumentpdfPlannedOnly if: hazardous materials

11Execution

CodeDocumentKindFormatStatusWhen
CT-01Schedulebar chart per phaseSchedulepdf, xlsxPlannedAlways
CT-03Deliveries and lead timeswhat to order, when, lead timeSchedulepdf, xlsxPlannedAlways
CT-05Work plan per phasesequence of work, crews, points of attentionDocumentpdfPlannedAlways
CT-06Waste and skip plantypes of waste, skips, removalDocumentpdfPlannedAlways
CT-08Overview of subcontractors and supplierswho does what, contact, status of the orderSchedulepdf, xlsxPlannedAlways
CT-09Daily and weekly reportattendance, work, weather, special eventsFormpdf, xlsxPlannedAlways
CT-10Minutes of the site meetingagreements, actions, deadlinesFormpdf, xlsxPlannedAlways
CT-11Letter to residents and neighboursschedule, working hours, nuisance, contactDocumentpdfPlannedAlways
CT-12Protection and covering planprotecting floors, stairs, lift and furnitureDocumentpdfPlannedAlways

12Costs and purchasing

CodeDocumentKindFormatStatusWhen
CS-05Payment schedule and cash flowpayment instalments and cash flowSchedulepdf, xlsxPlannedAlways
CS-07Provisional sums and optionsprovisional sums with settlement pricesSchedulepdf, xlsxPlannedAlways
CS-21Internal working budgetmaterial, labour, equipment, subcontractingSchedulepdf, xlsxPlannedAlways
CS-22Surcharges and profitsite costs, overheads, risk, profitSchedulepdf, xlsxPlannedAlways
CS-23Rates sheet per tradehourly rate per tradeSchedulepdf, xlsxPlannedAlways
CS-24Quotation for the clientprice per item, provisional sums, conditions, validityDocumentpdfPlannedAlways
CS-25Budget check and justificationbudget, price, shortfall or margin, optionsSchedulepdf, xlsxPlannedAlways
CS-26Labour budget per trade and phasehours per trade and phaseSchedulepdf, xlsxPlannedAlways
CS-27Price and source registerprice, supplier, date and source per lineSchedulepdf, xlsxPlannedAlways
CS-28Purchase list with supplier and stockcheapest offer in stock, alternative, dateSchedulepdf, xlsxPlannedAlways
CS-29Additional and omitted work statementchange, price, approval of the clientFormpdf, xlsxPlannedAlways
CS-31Comparison of subcontractor quotationsprices side by side; differences in scopeSchedulepdf, xlsxPlannedAlways
CS-32VAT check per linewhich rate applies per itemSchedulepdf, xlsxPlannedAlways
CS-34Post-calculationactual costs against the budgetSchedulepdf, xlsxPlannedAlways

13Specification and builder's guide

CodeDocumentKindFormatStatusWhen
BSSpecificationtechnical description per itemDocumentpdfPlannedAlways
BS-02Manufacturers' installation instructionsinstallation instructions for the products usedDocumentpdfPlannedAlways
BS-03Quality and performance declarationsKOMO, CE and declaration of performance per productDocumentpdfPlannedAlways

14Quality and inspections

CodeDocumentKindFormatStatusWhen
KW-01Inspection plan per building phasewhat to inspect, when, by whom, which evidenceSchedulepdf, xlsxPlannedAlways
KW-02Inspection formschecklist per inspection pointFormpdf, xlsxPlannedAlways
KW-03Photo file of inspection pointsreinforcement, insulation, air tightness, pipes before closingReportpdfPlannedAlways
KW-04Delivery notes and certificatesconcrete, steel, timber, insulationDocumentpdfPlannedAlways
KW-05Deviation registerdeviation, cause, repair, approvalSchedulepdf, xlsxPlannedAlways
KW-06Screed moisture measurementresidual moisture before the floor finishReportpdfPlannedAlways

15Handover

CodeDocumentKindFormatStatusWhen
OP-01Pre-inspection and snagging listdefects per room; repair periodFormpdf, xlsxPlannedAlways
OP-02Handover reportdate, remaining items, signaturesFormpdf, xlsxPlannedAlways
OP-03As-built drawingsas built, all disciplinesDrawingpdf, dxfPlannedAlways
OP-05Operating and maintenance instructionsoperation and care of installations and finishesDocumentpdfPlannedAlways
OP-06Warranty statementswarranties from suppliers and installersDocumentpdfPlannedAlways
OP-07Handover of keys and meter readingskeys, codes, meter readings on the handover dateFormpdf, xlsxPlannedAlways

16Contract

CodeDocumentKindFormatStatusWhen
CO-01Building contractparties, work, price, schedule, conditionsDocumentpdfPlannedAlways
CO-02General terms and conditionsconditions of the contractorDocumentpdfPlannedAlways
CO-03Proof of insuranceconstruction and liability insuranceDocumentpdfPlannedAlways

17Renovation

CodeDocumentKindFormatStatusWhen
R-01Measured plan of the existing situationscale sketch with dimensions per roomDrawingpdf, dxfPlannedOnly if: existing building
R-02Room schedule with dimensions and quantitiesper room: floor, net walls, ceiling, skirtingSchedulepdf, xlsxPlannedOnly if: existing building
R-03Demolition and partition planwhat is removed and what is newDrawingpdf, dxfPlannedOnly if: structural work, existing building
R-04Scope of work per roomwork, material, sequence and finish per roomDocumentpdfPlannedOnly if: existing building
R-05Electrics per roomsockets, light points, switches, circuitsDrawingpdf, dxfPlannedOnly if: utility connection, existing building
R-06Plumbing and heating per roomdraw-off points, drains, radiators or underfloor heatingDrawingpdf, dxfPlannedOnly if: existing building
R-07Wall elevations of wet roomstiling, fixtures, heightsDrawingpdf, dxfPlannedOnly if: existing building
R-08Materials schedule in purchasing unitsnet, waste, gross, packagingSchedulepdf, xlsxPlannedAlways
R-09Hours per trade and schedulehours per trade, sequence, durationSchedulepdf, xlsxPlannedAlways
R-10Register of unknownswhat becomes visible only after opening up, with a reserveSchedulepdf, xlsxPlannedOnly if: structural work, existing building, hazardous materials
R-11Photo list before startwhich photos are neededSchedulepdf, xlsxPlannedOnly if: existing building, hazardous materials
R-13Restoring fire and sound separationssealing penetrations in walls and floorsDrawingpdf, dxfPlannedAlways

18Office and fit-out

CodeDocumentKindFormatStatusWhen
O-01Partition and door plansystem partitions, glass walls, doorsDrawingpdf, dxfPlannedOnly if: permit needed, existing building
O-02Ceiling and lighting plansystem ceiling, luminaires, emergency lightingDrawingpdf, dxfPlannedOnly if: existing building
O-03Floor finish planfloor type per zoneDrawingpdf, dxfPlannedOnly if: existing building
O-04Electrics, data and workstationssockets, data connections, patch cabinetDrawingpdf, dxfPlannedOnly if: utility connection, existing building
O-05Ventilation and fire safetycapacity per person, escape routes, extinguishersDrawingpdf, dxfPlannedOnly if: utility connection, permit needed
O-06Occupancy and workstation plannumber of persons, workstations, toiletsDrawingpdf, dxfPlannedOnly if: permit needed

00General

CodeDocumentKindFormatStatusWhen
AL-01Cover sheet and project dataaddress, cadastral parcel, parties, date, revisionDocumentpdfPlannedAlways
AL-02List of documents and drawingsall documents with code, version, date and statusSchedulepdf, xlsxPlannedAlways
AL-03Status statement and reading guidedraft or final; what the document is and is not valid forDocumentpdfPlannedDraftAlways
AL-04Starting points and client briefwishes, budget, floor area, finish level, assumptionsDocumentpdfPlannedAlways
AL-05Register of conditional itemsper item: reason, survey needed, possible price effectSchedulepdf, xlsxPlannedAlways
AL-06Change log per revisionwhat changed, by whom, whenSchedulepdf, xlsxPlannedAlways
AL-07Contact list of project partiesclient, contractor, advisers, installers, grid operatorsSchedulepdf, xlsxPlannedAlways
AL-09Demarcation listwho supplies and installs what: contractor, client, third partiesSchedulepdf, xlsxPlannedAlways

01Site and surveys

CodeDocumentKindFormatStatusWhen
LO-02Check against the zoning planland use, building envelope, eaves and building height, distancesReportpdfPlannedDraftOnly if: permit needed
LO-07Asbestos inventory reportasbestos-containing materials and risk classReportpdfPlannedOnly if: hazardous materials
LO-08Drawings of the existing situationplans, elevations and sections as measured; existing next to newDrawingpdf, dxfPlannedOnly if: existing building
LO-09Photo report of existing state and neighboursphotos before the start; cracks and damage recordedReportpdfPlannedOnly if: existing building
LO-10Structural survey of the existing buildingload-bearing walls, floors, pipework, defectsReportpdfPlannedIndicative, not for construction · for structural engineer to checkOnly if: existing building, structural work
LO-11Municipal archive drawingsold building drawings and permitsDocumentpdfPlannedOnly if: existing building
LO-16VvE consent and division ruleswhat is allowed, working hours, requirements for floor and pipeworkDocumentpdfPlannedOnly if: permit needed
LO-17Landlord consent and hand-back conditionwhat the tenant may change; condition at hand-backDocumentpdfPlannedOnly if: permit needed

02Architecture

CodeDocumentKindFormatStatusWhen
AR-15Room schedule NEN 2580areas per room, GO and BVOSchedulepdf, xlsxPlannedAlways
AR-17Door scheduledoor type, size, swing directionSchedulepdf, xlsxPlannedAlways
AR-19Finishes schedulefloor, wall and ceiling per roomSchedulepdf, xlsxPlannedAlways
AR-21Fire safetysmoke alarms, escape route, fire compartmentsDrawingpdf, dxfPlannedOnly if: permit needed
AR-24Open items registerwhat still has to be confirmed or suppliedSchedulepdf, xlsxPlannedAlways
AR-25Floor and ceiling plansfloor finish and ceilings per roomDrawingpdf, dxfPlannedAlways
AR-31Working plans 1:50full dimensioning, openings, levelsDrawingpdf, dxfPlannedAlways
AR-33Overview of wall typesbuild-up per wall type, fire and sound requirementDrawingpdf, dxfPlannedAlways
AR-34Door hardware schedulehinges, locks, handles, burglar resistanceSchedulepdf, xlsxPlannedAlways
AR-37Tile layout planlaying direction, starting point, cutting lossDrawingpdf, dxfPlannedAlways
AR-39Colour and materials schedulebrand, type and colour code, outside and insideSchedulepdf, xlsxPlannedAlways
AR-41Furnishing planfurniture, cupboards, workstationsDrawingpdf, dxfPlannedAlways

05Electrical

CodeDocumentKindFormatStatusWhen
EL-11Lighting plan and switching diagramsluminaires, switching, dimmersDrawingpdf, dxfPlannedAlways
EL-12Low-voltage and datadata, fibre, TV, doorbell, intercomDrawingpdf, dxfPlannedAlways
EL-13Smoke detectors and emergency lightingposition and interconnection; emergency lighting in an officeDrawingpdf, dxfPlannedAlways
EL-15Circuit list and installation diagram at handoverfinal circuit layout at handoverDocumentpdfPlannedAlways
EL-16First inspection report NEN 1010measurements and testing of the installationReportpdfPlannedAlways
EL-17Survey of the existing electrical installationdistribution board, wiring, earthing, defectsReportpdfPlannedOnly if: existing building

06Water and drainage

CodeDocumentKindFormatStatusWhen
WR-12Survey of existing pipesrisers, material, condition, valvesReportpdfPlannedOnly if: existing building

07Heating and ventilation

CodeDocumentKindFormatStatusWhen
HV-15Office climate and ventilation systemventilation and cooling per person and roomCalculationpdf, xlsxPlannedOnly if: existing building

09Permits and Wkb

CodeDocumentKindFormatStatusWhen
VG-01Permit check (Omgevingsloket)outcome: permit, notification or exemptDocumentpdfPlannedOnly if: permit needed
VG-02Application set for the environmental permitdrawings and forms for the applicationDocumentpdfPlannedOnly if: permit needed
VG-07Demolition notificationnotification of demolition to the municipalityFormpdf, xlsxPlannedOnly if: hazardous materials
VG-09Permit for use of public spacecontainer, scaffold or crane on the streetFormpdf, xlsxPlannedOnly if: permit needed
VG-10Notification of fire-safe usenotification for large numbers of peopleFormpdf, xlsxPlannedOnly if: permit needed

What you need from third parties

Others supply these documents, such as a surveyor, a testing firm, the municipality or the land registry. They are not part of our package; here you see what you need them for.

CodeDocumentWhat it is for
LO-07Asbestos inventory reportasbestos-containing materials and risk class
LO-10Structural survey of the existing buildingload-bearing walls, floors, pipework, defects
LO-11Municipal archive drawingsold building drawings and permits
LO-16VvE consent and division ruleswhat is allowed, working hours, requirements for floor and pipework
LO-17Landlord consent and hand-back conditionwhat the tenant may change; condition at hand-back
EL-15Circuit list and installation diagram at handoverfinal circuit layout at handover
EL-16First inspection report NEN 1010measurements and testing of the installation
EL-17Survey of the existing electrical installationdistribution board, wiring, earthing, defects
WR-12Survey of existing pipesrisers, material, condition, valves
VG-07Demolition notificationnotification of demolition to the municipality
VG-09Permit for use of public spacecontainer, scaffold or crane on the street
VG-10Notification of fire-safe usenotification for large numbers of people
VH-01Health and safety plan, design phaserisks arising from the design
CT-08Overview of subcontractors and supplierswho does what, contact, status of the order
BS-02Manufacturers' installation instructionsinstallation instructions for the products used
BS-03Quality and performance declarationsKOMO, CE and declaration of performance per product
KW-03Photo file of inspection pointsreinforcement, insulation, air tightness, pipes before closing
KW-04Delivery notes and certificatesconcrete, steel, timber, insulation
KW-06Screed moisture measurementresidual moisture before the floor finish
OP-05Operating and maintenance instructionsoperation and care of installations and finishes
OP-06Warranty statementswarranties from suppliers and installers
CO-01Building contractparties, work, price, schedule, conditions
CO-02General terms and conditionsconditions of the contractor
CO-03Proof of insuranceconstruction and liability insurance