Package by situation
Office or commercial fit-out
Coming soon
Who it is for
For anyone fitting out or converting an office or commercial space.
Coming soon: this package cannot be ordered yet. The list below is the planned composition; every document is marked «planned». There is no price and no delivery time yet.
The planned composition in numbers
- Drawings and diagrams
- 23
- Schedules and calculations
- 42
- Documents
- 39
- 3D model
- 0
- Total
- 104
Three sets from the same package
Everyone gets only the documents meant for them.
For the crew
What the crew needs on site: drawings, details and the work description.
54 planned documents
1 structural documents (the request package for the structural engineer) join the crew set only after the engineer has confirmed them. Until then: Indicative, not for construction.
Show the list
- AL-02 List of documents and drawings
- AL-03 Status statement and reading guide
- AL-06 Change log per revision
- AL-07 Contact list of project parties
- AL-09 Demarcation list
- LO-07 Asbestos inventory report
- LO-08 Drawings of the existing situation
- AR-17 Door schedule
- AR-19 Finishes schedule
- AR-21 Fire safety
- AR-24 Open items register
- AR-25 Floor and ceiling plans
- AR-31 Working plans 1:50
- AR-33 Overview of wall types
- AR-34 Door hardware schedule
- AR-37 Tile layout plan
- AR-39 Colour and materials schedule
- EL-11 Lighting plan and switching diagrams
- EL-12 Low-voltage and data
- EL-13 Smoke detectors and emergency lighting
- EL-17 Survey of the existing electrical installation
- WR-12 Survey of existing pipes
- HV-15 Office climate and ventilation system
- VH-02 Health and safety plan, construction phase
- VH-05 Site rules and emergency plan
- VH-06 Dust and asbestos control
- CT-01 Schedule
- CT-03 Deliveries and lead times
- CT-05 Work plan per phase
- CT-06 Waste and skip plan
- CT-09 Daily and weekly report
- CT-12 Protection and covering plan
- CS-28 Purchase list with supplier and stock
- BS Specification
- BS-02 Manufacturers' installation instructions
- KW-01 Inspection plan per building phase
- KW-02 Inspection forms
- KW-06 Screed moisture measurement
- OP-01 Pre-inspection and snagging list
- R-01 Measured plan of the existing situation
- R-02 Room schedule with dimensions and quantities
- R-03 Demolition and partition plan
- R-04 Scope of work per room
- R-05 Electrics per room
- R-06 Plumbing and heating per room
- R-07 Wall elevations of wet rooms
- R-08 Materials schedule in purchasing units
- R-09 Hours per trade and schedule
- R-13 Restoring fire and sound separations
- O-01 Partition and door plan
- O-02 Ceiling and lighting plan
- O-03 Floor finish plan
- O-04 Electrics, data and workstations
- O-05 Ventilation and fire safety
For the contractor (estimating and purchasing)
Quantities, order lists, schedules for price requests and the programme.
61 planned documents
Show the list
- AL-01 Cover sheet and project data
- AL-02 List of documents and drawings
- AL-03 Status statement and reading guide
- AL-04 Starting points and client brief
- AL-05 Register of conditional items
- AL-06 Change log per revision
- AL-07 Contact list of project parties
- AL-09 Demarcation list
- LO-02 Check against the zoning plan
- LO-09 Photo report of existing state and neighbours
- LO-10 Structural survey of the existing building
- LO-11 Municipal archive drawings
- LO-16 VvE consent and division rules
- LO-17 Landlord consent and hand-back condition
- AR-15 Room schedule NEN 2580
- AR-17 Door schedule
- AR-19 Finishes schedule
- AR-24 Open items register
- AR-34 Door hardware schedule
- AR-39 Colour and materials schedule
- EL-17 Survey of the existing electrical installation
- WR-12 Survey of existing pipes
- VG-01 Permit check (Omgevingsloket)
- VH-01 Health and safety plan, design phase
- VH-02 Health and safety plan, construction phase
- CT-01 Schedule
- CT-03 Deliveries and lead times
- CT-08 Overview of subcontractors and suppliers
- CT-09 Daily and weekly report
- CT-10 Minutes of the site meeting
- CS-05 Payment schedule and cash flow
- CS-07 Provisional sums and options
- CS-21 Internal working budget
- CS-22 Surcharges and profit
- CS-23 Rates sheet per trade
- CS-25 Budget check and justification
- CS-26 Labour budget per trade and phase
- CS-27 Price and source register
- CS-28 Purchase list with supplier and stock
- CS-29 Additional and omitted work statement
- CS-31 Comparison of subcontractor quotations
- CS-32 VAT check per line
- CS-34 Post-calculation
- BS Specification
- BS-03 Quality and performance declarations
- KW-01 Inspection plan per building phase
- KW-03 Photo file of inspection points
- KW-04 Delivery notes and certificates
- KW-05 Deviation register
- OP-01 Pre-inspection and snagging list
- OP-02 Handover report
- OP-07 Handover of keys and meter readings
- CO-01 Building contract
- CO-02 General terms and conditions
- CO-03 Proof of insurance
- R-02 Room schedule with dimensions and quantities
- R-08 Materials schedule in purchasing units
- R-09 Hours per trade and schedule
- R-10 Register of unknowns
- R-11 Photo list before start
- O-06 Occupancy and workstation plan
For the client
Overview, choices, payment schedule and the documents you keep.
37 planned documents
Show the list
- AL-01 Cover sheet and project data
- AL-02 List of documents and drawings
- AL-03 Status statement and reading guide
- AL-04 Starting points and client brief
- AL-05 Register of conditional items
- AL-06 Change log per revision
- AL-09 Demarcation list
- LO-09 Photo report of existing state and neighbours
- LO-16 VvE consent and division rules
- LO-17 Landlord consent and hand-back condition
- AR-19 Finishes schedule
- AR-24 Open items register
- AR-39 Colour and materials schedule
- AR-41 Furnishing plan
- EL-11 Lighting plan and switching diagrams
- EL-15 Circuit list and installation diagram at handover
- EL-16 First inspection report NEN 1010
- VG-01 Permit check (Omgevingsloket)
- CT-01 Schedule
- CT-10 Minutes of the site meeting
- CT-11 Letter to residents and neighbours
- CS-05 Payment schedule and cash flow
- CS-07 Provisional sums and options
- CS-24 Quotation for the client
- CS-25 Budget check and justification
- CS-29 Additional and omitted work statement
- BS Specification
- OP-01 Pre-inspection and snagging list
- OP-02 Handover report
- OP-03 As-built drawings
- OP-05 Operating and maintenance instructions
- OP-06 Warranty statements
- OP-07 Handover of keys and meter readings
- CO-01 Building contract
- CO-02 General terms and conditions
- CO-03 Proof of insurance
- R-10 Register of unknowns
All documents by section
For each document: kind, file format, status and when it is needed.
10Safety
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| VH-01 | Health and safety plan, design phaserisks arising from the design | Document | Planned | Always | |
| VH-02 | Health and safety plan, construction phaseproject-specific risks and measures | Document | Planned | Always | |
| VH-05 | Site rules and emergency planaccess, protective equipment, first aid, emergency numbers | Document | Planned | Always | |
| VH-06 | Dust and asbestos controlworking method during demolition: extraction and screening | Document | Planned | Only if: hazardous materials |
11Execution
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| CT-01 | Schedulebar chart per phase | Schedule | pdf, xlsx | Planned | Always |
| CT-03 | Deliveries and lead timeswhat to order, when, lead time | Schedule | pdf, xlsx | Planned | Always |
| CT-05 | Work plan per phasesequence of work, crews, points of attention | Document | Planned | Always | |
| CT-06 | Waste and skip plantypes of waste, skips, removal | Document | Planned | Always | |
| CT-08 | Overview of subcontractors and supplierswho does what, contact, status of the order | Schedule | pdf, xlsx | Planned | Always |
| CT-09 | Daily and weekly reportattendance, work, weather, special events | Form | pdf, xlsx | Planned | Always |
| CT-10 | Minutes of the site meetingagreements, actions, deadlines | Form | pdf, xlsx | Planned | Always |
| CT-11 | Letter to residents and neighboursschedule, working hours, nuisance, contact | Document | Planned | Always | |
| CT-12 | Protection and covering planprotecting floors, stairs, lift and furniture | Document | Planned | Always |
12Costs and purchasing
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| CS-05 | Payment schedule and cash flowpayment instalments and cash flow | Schedule | pdf, xlsx | Planned | Always |
| CS-07 | Provisional sums and optionsprovisional sums with settlement prices | Schedule | pdf, xlsx | Planned | Always |
| CS-21 | Internal working budgetmaterial, labour, equipment, subcontracting | Schedule | pdf, xlsx | Planned | Always |
| CS-22 | Surcharges and profitsite costs, overheads, risk, profit | Schedule | pdf, xlsx | Planned | Always |
| CS-23 | Rates sheet per tradehourly rate per trade | Schedule | pdf, xlsx | Planned | Always |
| CS-24 | Quotation for the clientprice per item, provisional sums, conditions, validity | Document | Planned | Always | |
| CS-25 | Budget check and justificationbudget, price, shortfall or margin, options | Schedule | pdf, xlsx | Planned | Always |
| CS-26 | Labour budget per trade and phasehours per trade and phase | Schedule | pdf, xlsx | Planned | Always |
| CS-27 | Price and source registerprice, supplier, date and source per line | Schedule | pdf, xlsx | Planned | Always |
| CS-28 | Purchase list with supplier and stockcheapest offer in stock, alternative, date | Schedule | pdf, xlsx | Planned | Always |
| CS-29 | Additional and omitted work statementchange, price, approval of the client | Form | pdf, xlsx | Planned | Always |
| CS-31 | Comparison of subcontractor quotationsprices side by side; differences in scope | Schedule | pdf, xlsx | Planned | Always |
| CS-32 | VAT check per linewhich rate applies per item | Schedule | pdf, xlsx | Planned | Always |
| CS-34 | Post-calculationactual costs against the budget | Schedule | pdf, xlsx | Planned | Always |
13Specification and builder's guide
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| BS | Specificationtechnical description per item | Document | Planned | Always | |
| BS-02 | Manufacturers' installation instructionsinstallation instructions for the products used | Document | Planned | Always | |
| BS-03 | Quality and performance declarationsKOMO, CE and declaration of performance per product | Document | Planned | Always |
14Quality and inspections
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| KW-01 | Inspection plan per building phasewhat to inspect, when, by whom, which evidence | Schedule | pdf, xlsx | Planned | Always |
| KW-02 | Inspection formschecklist per inspection point | Form | pdf, xlsx | Planned | Always |
| KW-03 | Photo file of inspection pointsreinforcement, insulation, air tightness, pipes before closing | Report | Planned | Always | |
| KW-04 | Delivery notes and certificatesconcrete, steel, timber, insulation | Document | Planned | Always | |
| KW-05 | Deviation registerdeviation, cause, repair, approval | Schedule | pdf, xlsx | Planned | Always |
| KW-06 | Screed moisture measurementresidual moisture before the floor finish | Report | Planned | Always |
15Handover
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| OP-01 | Pre-inspection and snagging listdefects per room; repair period | Form | pdf, xlsx | Planned | Always |
| OP-02 | Handover reportdate, remaining items, signatures | Form | pdf, xlsx | Planned | Always |
| OP-03 | As-built drawingsas built, all disciplines | Drawing | pdf, dxf | Planned | Always |
| OP-05 | Operating and maintenance instructionsoperation and care of installations and finishes | Document | Planned | Always | |
| OP-06 | Warranty statementswarranties from suppliers and installers | Document | Planned | Always | |
| OP-07 | Handover of keys and meter readingskeys, codes, meter readings on the handover date | Form | pdf, xlsx | Planned | Always |
16Contract
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| CO-01 | Building contractparties, work, price, schedule, conditions | Document | Planned | Always | |
| CO-02 | General terms and conditionsconditions of the contractor | Document | Planned | Always | |
| CO-03 | Proof of insuranceconstruction and liability insurance | Document | Planned | Always |
17Renovation
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| R-01 | Measured plan of the existing situationscale sketch with dimensions per room | Drawing | pdf, dxf | Planned | Only if: existing building |
| R-02 | Room schedule with dimensions and quantitiesper room: floor, net walls, ceiling, skirting | Schedule | pdf, xlsx | Planned | Only if: existing building |
| R-03 | Demolition and partition planwhat is removed and what is new | Drawing | pdf, dxf | Planned | Only if: structural work, existing building |
| R-04 | Scope of work per roomwork, material, sequence and finish per room | Document | Planned | Only if: existing building | |
| R-05 | Electrics per roomsockets, light points, switches, circuits | Drawing | pdf, dxf | Planned | Only if: utility connection, existing building |
| R-06 | Plumbing and heating per roomdraw-off points, drains, radiators or underfloor heating | Drawing | pdf, dxf | Planned | Only if: existing building |
| R-07 | Wall elevations of wet roomstiling, fixtures, heights | Drawing | pdf, dxf | Planned | Only if: existing building |
| R-08 | Materials schedule in purchasing unitsnet, waste, gross, packaging | Schedule | pdf, xlsx | Planned | Always |
| R-09 | Hours per trade and schedulehours per trade, sequence, duration | Schedule | pdf, xlsx | Planned | Always |
| R-10 | Register of unknownswhat becomes visible only after opening up, with a reserve | Schedule | pdf, xlsx | Planned | Only if: structural work, existing building, hazardous materials |
| R-11 | Photo list before startwhich photos are needed | Schedule | pdf, xlsx | Planned | Only if: existing building, hazardous materials |
| R-13 | Restoring fire and sound separationssealing penetrations in walls and floors | Drawing | pdf, dxf | Planned | Always |
18Office and fit-out
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| O-01 | Partition and door plansystem partitions, glass walls, doors | Drawing | pdf, dxf | Planned | Only if: permit needed, existing building |
| O-02 | Ceiling and lighting plansystem ceiling, luminaires, emergency lighting | Drawing | pdf, dxf | Planned | Only if: existing building |
| O-03 | Floor finish planfloor type per zone | Drawing | pdf, dxf | Planned | Only if: existing building |
| O-04 | Electrics, data and workstationssockets, data connections, patch cabinet | Drawing | pdf, dxf | Planned | Only if: utility connection, existing building |
| O-05 | Ventilation and fire safetycapacity per person, escape routes, extinguishers | Drawing | pdf, dxf | Planned | Only if: utility connection, permit needed |
| O-06 | Occupancy and workstation plannumber of persons, workstations, toilets | Drawing | pdf, dxf | Planned | Only if: permit needed |
00General
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| AL-01 | Cover sheet and project dataaddress, cadastral parcel, parties, date, revision | Document | Planned | Always | |
| AL-02 | List of documents and drawingsall documents with code, version, date and status | Schedule | pdf, xlsx | Planned | Always |
| AL-03 | Status statement and reading guidedraft or final; what the document is and is not valid for | Document | PlannedDraft | Always | |
| AL-04 | Starting points and client briefwishes, budget, floor area, finish level, assumptions | Document | Planned | Always | |
| AL-05 | Register of conditional itemsper item: reason, survey needed, possible price effect | Schedule | pdf, xlsx | Planned | Always |
| AL-06 | Change log per revisionwhat changed, by whom, when | Schedule | pdf, xlsx | Planned | Always |
| AL-07 | Contact list of project partiesclient, contractor, advisers, installers, grid operators | Schedule | pdf, xlsx | Planned | Always |
| AL-09 | Demarcation listwho supplies and installs what: contractor, client, third parties | Schedule | pdf, xlsx | Planned | Always |
01Site and surveys
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| LO-02 | Check against the zoning planland use, building envelope, eaves and building height, distances | Report | PlannedDraft | Only if: permit needed | |
| LO-07 | Asbestos inventory reportasbestos-containing materials and risk class | Report | Planned | Only if: hazardous materials | |
| LO-08 | Drawings of the existing situationplans, elevations and sections as measured; existing next to new | Drawing | pdf, dxf | Planned | Only if: existing building |
| LO-09 | Photo report of existing state and neighboursphotos before the start; cracks and damage recorded | Report | Planned | Only if: existing building | |
| LO-10 | Structural survey of the existing buildingload-bearing walls, floors, pipework, defects | Report | PlannedIndicative, not for construction · for structural engineer to check | Only if: existing building, structural work | |
| LO-11 | Municipal archive drawingsold building drawings and permits | Document | Planned | Only if: existing building | |
| LO-16 | VvE consent and division ruleswhat is allowed, working hours, requirements for floor and pipework | Document | Planned | Only if: permit needed | |
| LO-17 | Landlord consent and hand-back conditionwhat the tenant may change; condition at hand-back | Document | Planned | Only if: permit needed |
02Architecture
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| AR-15 | Room schedule NEN 2580areas per room, GO and BVO | Schedule | pdf, xlsx | Planned | Always |
| AR-17 | Door scheduledoor type, size, swing direction | Schedule | pdf, xlsx | Planned | Always |
| AR-19 | Finishes schedulefloor, wall and ceiling per room | Schedule | pdf, xlsx | Planned | Always |
| AR-21 | Fire safetysmoke alarms, escape route, fire compartments | Drawing | pdf, dxf | Planned | Only if: permit needed |
| AR-24 | Open items registerwhat still has to be confirmed or supplied | Schedule | pdf, xlsx | Planned | Always |
| AR-25 | Floor and ceiling plansfloor finish and ceilings per room | Drawing | pdf, dxf | Planned | Always |
| AR-31 | Working plans 1:50full dimensioning, openings, levels | Drawing | pdf, dxf | Planned | Always |
| AR-33 | Overview of wall typesbuild-up per wall type, fire and sound requirement | Drawing | pdf, dxf | Planned | Always |
| AR-34 | Door hardware schedulehinges, locks, handles, burglar resistance | Schedule | pdf, xlsx | Planned | Always |
| AR-37 | Tile layout planlaying direction, starting point, cutting loss | Drawing | pdf, dxf | Planned | Always |
| AR-39 | Colour and materials schedulebrand, type and colour code, outside and inside | Schedule | pdf, xlsx | Planned | Always |
| AR-41 | Furnishing planfurniture, cupboards, workstations | Drawing | pdf, dxf | Planned | Always |
05Electrical
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| EL-11 | Lighting plan and switching diagramsluminaires, switching, dimmers | Drawing | pdf, dxf | Planned | Always |
| EL-12 | Low-voltage and datadata, fibre, TV, doorbell, intercom | Drawing | pdf, dxf | Planned | Always |
| EL-13 | Smoke detectors and emergency lightingposition and interconnection; emergency lighting in an office | Drawing | pdf, dxf | Planned | Always |
| EL-15 | Circuit list and installation diagram at handoverfinal circuit layout at handover | Document | Planned | Always | |
| EL-16 | First inspection report NEN 1010measurements and testing of the installation | Report | Planned | Always | |
| EL-17 | Survey of the existing electrical installationdistribution board, wiring, earthing, defects | Report | Planned | Only if: existing building |
06Water and drainage
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| WR-12 | Survey of existing pipesrisers, material, condition, valves | Report | Planned | Only if: existing building |
07Heating and ventilation
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| HV-15 | Office climate and ventilation systemventilation and cooling per person and room | Calculation | pdf, xlsx | Planned | Only if: existing building |
09Permits and Wkb
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| VG-01 | Permit check (Omgevingsloket)outcome: permit, notification or exempt | Document | Planned | Only if: permit needed | |
| VG-02 | Application set for the environmental permitdrawings and forms for the application | Document | Planned | Only if: permit needed | |
| VG-07 | Demolition notificationnotification of demolition to the municipality | Form | pdf, xlsx | Planned | Only if: hazardous materials |
| VG-09 | Permit for use of public spacecontainer, scaffold or crane on the street | Form | pdf, xlsx | Planned | Only if: permit needed |
| VG-10 | Notification of fire-safe usenotification for large numbers of people | Form | pdf, xlsx | Planned | Only if: permit needed |
What you need from third parties
Others supply these documents, such as a surveyor, a testing firm, the municipality or the land registry. They are not part of our package; here you see what you need them for.
| Code | Document | What it is for |
|---|---|---|
| LO-07 | Asbestos inventory report | asbestos-containing materials and risk class |
| LO-10 | Structural survey of the existing building | load-bearing walls, floors, pipework, defects |
| LO-11 | Municipal archive drawings | old building drawings and permits |
| LO-16 | VvE consent and division rules | what is allowed, working hours, requirements for floor and pipework |
| LO-17 | Landlord consent and hand-back condition | what the tenant may change; condition at hand-back |
| EL-15 | Circuit list and installation diagram at handover | final circuit layout at handover |
| EL-16 | First inspection report NEN 1010 | measurements and testing of the installation |
| EL-17 | Survey of the existing electrical installation | distribution board, wiring, earthing, defects |
| WR-12 | Survey of existing pipes | risers, material, condition, valves |
| VG-07 | Demolition notification | notification of demolition to the municipality |
| VG-09 | Permit for use of public space | container, scaffold or crane on the street |
| VG-10 | Notification of fire-safe use | notification for large numbers of people |
| VH-01 | Health and safety plan, design phase | risks arising from the design |
| CT-08 | Overview of subcontractors and suppliers | who does what, contact, status of the order |
| BS-02 | Manufacturers' installation instructions | installation instructions for the products used |
| BS-03 | Quality and performance declarations | KOMO, CE and declaration of performance per product |
| KW-03 | Photo file of inspection points | reinforcement, insulation, air tightness, pipes before closing |
| KW-04 | Delivery notes and certificates | concrete, steel, timber, insulation |
| KW-06 | Screed moisture measurement | residual moisture before the floor finish |
| OP-05 | Operating and maintenance instructions | operation and care of installations and finishes |
| OP-06 | Warranty statements | warranties from suppliers and installers |
| CO-01 | Building contract | parties, work, price, schedule, conditions |
| CO-02 | General terms and conditions | conditions of the contractor |
| CO-03 | Proof of insurance | construction and liability insurance |
Let us know
Leave your e-mail address; we use it only to tell you when this package becomes available. We ask nothing more.