Package by situation

New-build house

Available to order

Who it is for

For anyone building a house from scratch who wants one package to permit, order materials and build.

This is the composition of the sample package: only documents that package really contains. Indicative draft, checked automatically and not reviewed by a specialist; not a permit or construction document.

The composition in numbers

Drawings and diagrams
50
Schedules and calculations
38
Documents
6
3D model
1
Total
95

Three sets from the same package

Everyone gets only the documents meant for them.

  • For the crew

    What the crew needs on site: drawings, details and the work description.

    58 documents

    11 structural documents (the request package for the structural engineer) join the crew set only after the engineer has confirmed them. Until then: Indicative, not for construction.

    Show the list
    • AL-08 3D model and visualisations
    • AR-01 Site plan
    • AR-02 Ground floor plan
    • AR-03 First floor plan
    • AR-04 Roof plan
    • AR-05 Elevations north + east
    • AR-06 Elevations south + west
    • AR-07 Section A-A
    • AR-08 Section B-B
    • AR-09 Details: foundation and floor
    • AR-10 Details: facade
    • AR-11 Details: window frames
    • AR-12 Details: roof
    • AR-13 Axonometry south-east
    • AR-16 Window and frame schedule
    • AR-17 Door schedule
    • AR-18 Material schedule
    • AR-19 Finishes schedule
    • AR-20 Brick coursing and dimensions
    • AR-21 Fire safety
    • AR-23 Details: interior and stair
    • AR-24 Open items register
    • AR-25 Floor and ceiling plans
    • AR-26 Wet rooms, wall developments
    • AR-27 Stair, calculation and check
    • AR-28 Wall junctions
    • AR-29 Roof junctions
    • AR-30 Foundation junctions
    • EN-01 Thermal envelope
    • EL-01 Electrical plan ground floor
    • EL-02 Electrical plan first floor
    • EL-03 Consumer unit (single-line diagram), PV, charging point
    • EL-05 Earthing and equipotential bonding
    • EL-06 Cable routes
    • EL-07 PV, charge point and EMS
    • EL-08 Electrical materials list
    • EL-09 Cable journal and phase loads
    • WR-01 Water and drainage ground floor
    • WR-02 Water, drainage and rainwater first floor
    • WR-03 Drainage and rainwater isometric
    • WR-05 Bathroom sanitary specification
    • WR-06 Water and drainage materials list
    • WR-07 Supply water axonometric
    • HV-02 Underfloor heating layout
    • HV-03 Heat pump and hydraulic diagram
    • HV-04 Ventilation HRV duct plan
    • HV-05 Controls
    • HV-06 Commissioning protocol
    • HV-07 Installation isometric
    • HV-08 HVAC materials list
    • HV-09 Installation details
    • CT-01 Schedule
    • CT-02 Wkb inspection points
    • CT-03 Deliveries and lead times
    • CT-04 Site logistics
    • CS-03 Order lists per phase
    • BS Specification
    • HB Build guide
  • For the contractor (estimating and purchasing)

    Quantities, order lists, schedules for price requests and the programme.

    28 documents

    Show the list
    • AR-15 Room schedule NEN 2580
    • AR-16 Window and frame schedule
    • AR-17 Door schedule
    • AR-18 Material schedule
    • AR-19 Finishes schedule
    • AR-24 Open items register
    • CD-02 Foundation beam reinforcement and bending schedule
    • CD-11 Structural quantities
    • CD-14 Bar bending schedule
    • CD-16 Foundation variants and ground slab
    • EL-08 Electrical materials list
    • EL-09 Cable journal and phase loads
    • WR-05 Bathroom sanitary specification
    • WR-06 Water and drainage materials list
    • HV-08 HVAC materials list
    • VG Permit and Wkb checklist
    • CT-01 Schedule
    • CT-03 Deliveries and lead times
    • CS-01 Element estimate
    • CS-02 Quantity take-off
    • CS-03 Order lists per phase
    • CS-04 RFQ packages per subcontractor
    • CS-05 Payment schedule and cash flow
    • CS-06 Self-build variant
    • CS-07 Provisional sums and options
    • CS-08 Cost indicators
    • CS-20 Cost estimate: summary, quantities, procurement, payments, labour and sources
    • BS Specification
  • For the client

    Overview, choices, payment schedule and the documents you keep.

    14 documents

    Show the list
    • AL-08 3D model and visualisations
    • AR-13 Axonometry south-east
    • AR-14 Perspective south-east (schematic)
    • AR-19 Finishes schedule
    • AR-24 Open items register
    • CD-16 Foundation variants and ground slab
    • WR-05 Bathroom sanitary specification
    • HV-06 Commissioning protocol
    • VG Permit and Wkb checklist
    • CT-01 Schedule
    • CS-05 Payment schedule and cash flow
    • CS-06 Self-build variant
    • CS-07 Provisional sums and options
    • BS Specification

All documents by section

For each document: kind, file format, status and when it is needed.

11Execution

CodeDocumentKindFormatStatusWhen
CT-01Schedulebar chart per phaseSchedulepdf, xlsxIn the packageAlways
CT-02Wkb inspection pointsinspection points and evidence per phaseSchedulepdf, xlsxIn the packageAlways
CT-03Deliveries and lead timeswhat to order, when, lead timeSchedulepdf, xlsxIn the packageAlways
CT-04Site logisticsstorage, site cabin, crane, access and removalDrawingpdf, dxfIn the packageOnly if: site survey

12Costs and purchasing

CodeDocumentKindFormatStatusWhen
CS-01Element estimatecost per building elementSchedulepdf, xlsxIn the packageAlways
CS-02Quantity take-offquantities per itemSchedulepdf, xlsxIn the packageAlways
CS-03Order lists per phasematerial per phase in purchasing unitsSchedulepdf, xlsxIn the packageAlways
CS-04RFQ packages per subcontractorrequest for quotation per tradeDocumentpdfIn the packageAlways
CS-05Payment schedule and cash flowpayment instalments and cash flowSchedulepdf, xlsxIn the packageAlways
CS-06Self-build variantwhat the client can do personally and the savingSchedulepdf, xlsxIn the packageAlways
CS-07Provisional sums and optionsprovisional sums with settlement pricesSchedulepdf, xlsxIn the packageAlways
CS-08Cost indicatorscost per m² and per itemSchedulepdf, xlsxIn the packageAlways
CS-20Cost estimate: summary, quantities, procurement, payments, labour and sourcesfull estimate with sourcesDocumentpdfIn the packageAlways

13Specification and builder's guide

CodeDocumentKindFormatStatusWhen
BSSpecificationtechnical description per itemDocumentpdfIn the packageAlways
HBBuild guideexecution guide per phaseDocumentpdfIn the packageAlways

00General

CodeDocumentKindFormatStatusWhen
AL-083D model and visualisationsGLB model and renders of exterior and interior3D modelglbIn the packageAlways

02Architecture

CodeDocumentKindFormatStatusWhen
AR-01Site planplot, building, distances, north arrowDrawingpdf, dxfIn the packageOnly if: site survey, permit needed
AR-02Ground floor planlayout, dimensions, room namesDrawingpdf, dxfIn the packageAlways
AR-03First floor planlayout, dimensions, room namesDrawingpdf, dxfIn the packageAlways
AR-04Roof planroof planes, falls, gutters, roof penetrationsDrawingpdf, dxfIn the packageAlways
AR-05Elevations north + eastviews with heights and materialsDrawingpdf, dxfIn the packageAlways
AR-06Elevations south + westviews with heights and materialsDrawingpdf, dxfIn the packageAlways
AR-07Section A-Aheights, floor build-up, roof build-upDrawingpdf, dxfIn the packageAlways
AR-08Section B-Bsecond section, at right angles to A-ADrawingpdf, dxfIn the packageAlways
AR-09Details: foundation and floorjunctions at detail scaleDrawingpdf, dxfIn the packageOnly if: soil survey, structural work
AR-10Details: facadewall build-up, insulation, cavityDrawingpdf, dxfIn the packageAlways
AR-11Details: window framessill, head and jamb junction of the frameDrawingpdf, dxfIn the packageAlways
AR-12Details: roofroof edge, gutter, ridge, penetrationsDrawingpdf, dxfIn the packageAlways
AR-13Axonometry south-eastspatial overview of the buildingDiagrampdf, dxfIn the packageAlways
AR-14Perspective south-east (schematic)schematic image of the buildingDiagrampdf, dxfIn the packageAlways
AR-15Room schedule NEN 2580areas per room, GO and BVOSchedulepdf, xlsxIn the packageAlways
AR-16Window and frame schedulemark, size, swing direction and glass per windowSchedulepdf, xlsxIn the packageAlways
AR-17Door scheduledoor type, size, swing directionSchedulepdf, xlsxIn the packageAlways
AR-18Material schedulematerials per building elementSchedulepdf, xlsxIn the packageAlways
AR-19Finishes schedulefloor, wall and ceiling per roomSchedulepdf, xlsxIn the packageAlways
AR-20Brick coursing and dimensionsbrickwork in courses, levelsDrawingpdf, dxfIn the packageAlways
AR-21Fire safetysmoke alarms, escape route, fire compartmentsDrawingpdf, dxfIn the packageOnly if: permit needed
AR-22Accessibility and Bbl checklistcheck against the building rules per itemSchedulepdf, xlsxIn the packageOnly if: permit needed
AR-23Details: interior and stairstair, balustrade, interior framesDrawingpdf, dxfIn the packageAlways
AR-24Open items registerwhat still has to be confirmed or suppliedSchedulepdf, xlsxIn the packageAlways
AR-25Floor and ceiling plansfloor finish and ceilings per roomDrawingpdf, dxfIn the packageAlways
AR-26Wet rooms, wall developmentswall views of bathroom and toilet with tilingDrawingpdf, dxfIn the packageAlways
AR-27Stair, calculation and checkrise, going, headroomCalculationpdf, xlsxIn the packageAlways
AR-28Wall junctionswall junction with floor, window and roofDrawingpdf, dxfIn the packageAlways
AR-29Roof junctionsroof junctionsDrawingpdf, dxfIn the packageAlways
AR-30Foundation junctionsjunction of foundation, floor and wallDrawingpdf, dxfIn the packageOnly if: soil survey, structural work

03Structure

CodeDocumentKindFormatStatusWhen
CD-01Foundation plan and concrete pour planfoundation strips or beams, dimensions, pouring sequenceDrawingpdf, dxfIn the packageIndicative, not for construction · for structural engineer to checkOnly if: soil survey, structural work
CD-02Foundation beam reinforcement and bending schedulereinforcement per beam, draftDrawingpdf, dxfIn the packageIndicative, not for construction · for structural engineer to checkOnly if: soil survey, structural work
CD-03Ground floor slabfloor type, span, insulationDrawingpdf, dxfIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work
CD-04First floor slabfloor type, span, openingsDrawingpdf, dxfIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work
CD-05Load-bearing walls and lintelsload-bearing walls, lintels, bearingsDrawingpdf, dxfIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work
CD-06Roof structurerafters, purlins, anchoringDrawingpdf, dxfIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work
CD-07Structural detailsanchorages and connectionsDrawingpdf, dxfIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work
CD-08Stabilitybracing walls and diaphragm actionDrawingpdf, dxfIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work
CD-09Loads and design basisloads, materials, standardsCalculationpdf, xlsxIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work
CD-10Structural calculationindicative calculation of the main load-bearing structureCalculationpdf, xlsxIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work
CD-11Structural quantitiesconcrete, steel, timber, floorsSchedulepdf, xlsxIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work
CD-12Structural inspection planinspection points: reinforcement, pour, floorsSchedulepdf, xlsxIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work
CD-13Formwork and strike timesformwork method and waiting timesSchedulepdf, xlsxIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work
CD-14Bar bending schedulebars per position, draftSchedulepdf, xlsxIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work
CD-15Concrete pours and jointsdivision of the pours and joint locationsDrawingpdf, dxfIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work
CD-16Foundation variants and ground slabpiles, strips or slab: choice and consequencesSchedulepdf, xlsxIn the packageIndicative, not for construction · for structural engineer to checkOnly if: soil survey
CD-17Slab layout, lintels and bearingsslab laying plan, lintels, bearing lengthsDrawingpdf, dxfIn the packageIndicative, not for construction · for structural engineer to checkOnly if: structural work

04Building physics and energy

CodeDocumentKindFormatStatusWhen
EN-01Thermal envelopeinsulation line and Rc valuesDrawingpdf, dxfIn the packageOnly if: energy calculation
EN-02BENG indicationindicative energy performanceCalculationpdf, xlsxIn the packageIndicativeOnly if: energy calculation
EN-03Daylightdaylight check for each habitable roomCalculationpdf, xlsxIn the packageOnly if: energy calculation
EN-04Ventilationrequired and designed air flowsCalculationpdf, xlsxIn the packageOnly if: energy calculation
EN-05Acoustics and firesound insulation and fire resistanceCalculationpdf, xlsxIn the packageOnly if: energy calculation
EN-06Environmental performance and material passportenvironmental performance, draftCalculationpdf, xlsxIn the packageDraftOnly if: energy calculation

05Electrical

CodeDocumentKindFormatStatusWhen
EL-01Electrical plan ground floorsockets, light points, switches, circuitsDrawingpdf, dxfIn the packageAlways
EL-02Electrical plan first floorsockets, light points, switches, circuitsDrawingpdf, dxfIn the packageAlways
EL-03Consumer unit (single-line diagram), PV, charging pointcircuits, protection, residual-current devicesDiagrampdf, dxfIn the packageOnly if: utility connection
EL-04Electrical calculationsload, cable cross-section, voltage dropCalculationpdf, xlsxIn the packageAlways
EL-05Earthing and equipotential bondingearth electrode; bonding in the bathroomDrawingpdf, dxfIn the packageAlways
EL-06Cable routesroutes, conduits, penetrationsDrawingpdf, dxfIn the packageAlways
EL-07PV, charge point and EMSpanels, inverter, charge point, energy managementDiagrampdf, dxfIn the packageOnly if: utility connection
EL-08Electrical materials listmaterials with quantitiesSchedulepdf, xlsxIn the packageAlways
EL-09Cable journal and phase loadscable per circuit, length, distribution over phasesSchedulepdf, xlsxIn the packageAlways

06Water and drainage

CodeDocumentKindFormatStatusWhen
WR-01Water and drainage ground floorpipes, drains, draw-off pointsDrawingpdf, dxfIn the packageOnly if: utility connection
WR-02Water, drainage and rainwater first floorpipes, drains and rainwater drainageDrawingpdf, dxfIn the packageAlways
WR-03Drainage and rainwater isometricdrain pipes with diameters and fallDiagrampdf, dxfIn the packageAlways
WR-04Calculation NEN 1006water supply: flow, diameters, waiting timeCalculationpdf, xlsxIn the packageAlways
WR-05Bathroom sanitary specificationfixtures, taps, installation heightsSchedulepdf, xlsxIn the packageAlways
WR-06Water and drainage materials listmaterials with quantitiesSchedulepdf, xlsxIn the packageAlways
WR-07Supply water axonometriccold and hot water pipesDiagrampdf, dxfIn the packageAlways

07Heating and ventilation

CodeDocumentKindFormatStatusWhen
HV-01Heat loss calculationrequired output per roomCalculationpdf, xlsxIn the packageOnly if: energy calculation
HV-02Underfloor heating layoutcircuits, pipe spacing, manifoldDrawingpdf, dxfIn the packageAlways
HV-03Heat pump and hydraulic diagramunit, buffer tank, boiler, fittingsDiagrampdf, dxfIn the packageAlways
HV-04Ventilation HRV duct planducts, valves, air flowsDrawingpdf, dxfIn the packageAlways
HV-05Controlsthermostats, zones, controlDiagrampdf, dxfIn the packageAlways
HV-06Commissioning protocolvalues to be filled in at handoverFormpdf, xlsxIn the packageAlways
HV-07Installation isometricthree-dimensional overview of the pipesDiagrampdf, dxfIn the packageAlways
HV-08HVAC materials listmaterials with quantitiesSchedulepdf, xlsxIn the packageAlways
HV-09Installation detailspenetrations, arrangement, fixingDrawingpdf, dxfIn the packageAlways

09Permits and Wkb

CodeDocumentKindFormatStatusWhen
VGPermit and Wkb checklistwhich permits and notifications are neededDocumentpdfIn the packageOnly if: permit needed

What you need from third parties

Others supply these documents, such as a surveyor, a testing firm, the municipality or the land registry. They are not part of our package; here you see what you need them for.

CodeDocumentWhat it is for
LO-01Cadastral map and ownership dataplot boundaries, easements, ground lease (erfpacht)
LO-03Land survey of the plotboundaries, levels, existing objects
LO-04Soil sounding and foundation advicebearing capacity, foundation method, pile level, groundwater level
LO-05Environmental soil investigationquality of soil and groundwater
LO-06KLIC notification and excavation maplocation of cables and pipes in the ground
LO-12Nature assessment (quickscan)protected species, for example bats
LO-13Acoustic study of façade noise loadnoise from road, rail or industry on the façade
LO-14Nitrogen calculation (AERIUS)nitrogen deposition in the construction and use phase
LO-15Application for utility connectionselectricity, water, sewer, fibre; capacity and date
CD-18Pile planpile numbers, loads, driving levels
CD-19Signed structural calculationfinal calculation by the structural engineer
CD-20Final reinforcement drawings and schedulesreleased for ordering steel
CD-21Steel structure and steel schedulesections, connections, corrosion protection
CD-23Prefab layout and production drawingsfloors and walls from the supplier
CD-26Dewatering and excavation supportlowering the groundwater; excavation enclosure
CD-27Pile driving or boring logper pile: depth and final set
EN-07Final BENG calculation (NTA 8800)final energy performance for the application
EN-08Energy label at completionlabel based on the building as built
EN-09Final MPG calculationcheck against the limit value
EN-11Air tightness testmeasured air permeability
EN-13Overheating check and solar shadingsummer comfort; shading per façade
EL-14PV registration and feed-inregistration of the installation with the grid operator
EL-15Circuit list and installation diagram at handoverfinal circuit layout at handover
EL-16First inspection report NEN 1010measurements and testing of the installation
WR-11Water and drainage test reportspressure test of the water supply; tightness of the drainage
HV-10Ventilation commissioning reportmeasured air flows per room
HV-11Floor heating start-up protocolgradual heating of the screed
HV-12Ground energy: notification and drilling planclosed ground loop: notification or permit
VG-04Building notification with quality assurance plan and risk assessmentnotification of building work under quality assurance
VG-05Notice of start and end of building worknotification to the municipality
VG-06Completion notice with the file for the authorityfile and statement of the quality assurer
VG-09Permit for use of public spacecontainer, scaffold or crane on the street
VG-12Consent of ground-lease holder or landownerconsent to build or alter
VG-13Dewatering notificationnotification or permit with the water board
VH-01Health and safety plan, design phaserisks arising from the design
VH-04Scaffolding, hoisting and fall protection planscaffolds, lifting operations, edge protection
CT-07Site facilitiessite power, site water, cabin, toilet
CT-08Overview of subcontractors and supplierswho does what, contact, status of the order
BS-02Manufacturers' installation instructionsinstallation instructions for the products used
BS-03Quality and performance declarationsKOMO, CE and declaration of performance per product
KW-03Photo file of inspection pointsreinforcement, insulation, air tightness, pipes before closing
KW-04Delivery notes and certificatesconcrete, steel, timber, insulation
KW-06Screed moisture measurementresidual moisture before the floor finish
KW-07Quality assurer's statementstatement that the building rules have been met
OP-05Operating and maintenance instructionsoperation and care of installations and finishes
OP-06Warranty statementswarranties from suppliers and installers
CO-01Building contractparties, work, price, schedule, conditions
CO-02General terms and conditionsconditions of the contractor
CO-03Proof of insuranceconstruction and liability insurance
CO-04Security and withholding of the last instalmentarrangement for the last payment
CO-05Information to the consumer on insurancewhether and how defects and insolvency are covered
CO-06Guarantee or warranty schemecertificate of the scheme

A few sheets from the sample package

Demo project Almere, 120 m².

  • AR-02 Ground floor plan

    AR-02

  • CD-01

    CD-01

  • EN-01

    EN-01

  • CS-01

    CS-01