Package by situation
Extension
Coming soon
Who it is for
For anyone extending an existing house or adding an annex.
Coming soon: this package cannot be ordered yet. The list below is the planned composition; every document is marked «planned». There is no price and no delivery time yet.
The planned composition in numbers
- Drawings and diagrams
- 77
- Schedules and calculations
- 79
- Documents
- 56
- 3D model
- 1
- Total
- 213
Three sets from the same package
Everyone gets only the documents meant for them.
For the crew
What the crew needs on site: drawings, details and the work description.
108 planned documents
19 structural documents (the request package for the structural engineer) join the crew set only after the engineer has confirmed them. Until then: Indicative, not for construction.
Show the list
- AL-02 List of documents and drawings
- AL-03 Status statement and reading guide
- AL-06 Change log per revision
- AL-07 Contact list of project parties
- AL-08 3D model and visualisations
- AL-09 Demarcation list
- LO-03 Land survey of the plot
- LO-06 KLIC notification and excavation map
- LO-07 Asbestos inventory report
- LO-08 Drawings of the existing situation
- AR-01 Site plan
- AR-02 Ground floor plan
- AR-03 First floor plan
- AR-04 Roof plan
- AR-05 Elevations north + east
- AR-06 Elevations south + west
- AR-07 Section A-A
- AR-08 Section B-B
- AR-09 Details: foundation and floor
- AR-10 Details: facade
- AR-11 Details: window frames
- AR-12 Details: roof
- AR-13 Axonometry south-east
- AR-16 Window and frame schedule
- AR-17 Door schedule
- AR-18 Material schedule
- AR-19 Finishes schedule
- AR-20 Brick coursing and dimensions
- AR-21 Fire safety
- AR-23 Details: interior and stair
- AR-24 Open items register
- AR-25 Floor and ceiling plans
- AR-26 Wet rooms, wall developments
- AR-27 Stair, calculation and check
- AR-28 Wall junctions
- AR-29 Roof junctions
- AR-30 Foundation junctions
- AR-31 Working plans 1:50
- AR-32 Setting-out plan and levels
- AR-33 Overview of wall types
- AR-34 Door hardware schedule
- AR-35 Glazing schedule
- AR-36 Kitchen drawing with connection points
- AR-37 Tile layout plan
- AR-39 Colour and materials schedule
- CD-20 Final reinforcement drawings and schedules
- CD-23 Prefab layout and production drawings
- CD-26 Dewatering and excavation support
- EN-01 Thermal envelope
- EN-10 Rc and U-value schedule
- EN-12 Noise calculation for the heat pump outdoor unit
- EL-01 Electrical plan ground floor
- EL-02 Electrical plan first floor
- EL-03 Consumer unit (single-line diagram), PV, charging point
- EL-05 Earthing and equipotential bonding
- EL-06 Cable routes
- EL-07 PV, charge point and EMS
- EL-08 Electrical materials list
- EL-09 Cable journal and phase loads
- EL-10 Meter cupboard layout
- EL-11 Lighting plan and switching diagrams
- EL-12 Low-voltage and data
- EL-13 Smoke detectors and emergency lighting
- WR-01 Water and drainage ground floor
- WR-02 Water, drainage and rainwater first floor
- WR-03 Drainage and rainwater isometric
- WR-05 Bathroom sanitary specification
- WR-06 Water and drainage materials list
- WR-07 Supply water axonometric
- WR-08 External drainage and connection to the public sewer
- WR-09 Rainwater: calculation, emergency overflows, infiltration
- HV-02 Underfloor heating layout
- HV-03 Heat pump and hydraulic diagram
- HV-04 Ventilation HRV duct plan
- HV-05 Controls
- HV-06 Commissioning protocol
- HV-07 Installation isometric
- HV-08 HVAC materials list
- HV-09 Installation details
- HV-11 Floor heating start-up protocol
- HV-13 Technical room layout
- TR-01 Site layout
- TR-02 Levels and site drainage
- TR-03 Earthworks and soil balance
- TR-05 Shed, fence and outbuildings
- VH-02 Health and safety plan, construction phase
- VH-03 Construction safety plan for the surroundings
- VH-04 Scaffolding, hoisting and fall protection plan
- VH-05 Site rules and emergency plan
- VH-06 Dust and asbestos control
- CT-01 Schedule
- CT-02 Wkb inspection points
- CT-03 Deliveries and lead times
- CT-04 Site logistics
- CT-05 Work plan per phase
- CT-06 Waste and skip plan
- CT-07 Site facilities
- CT-09 Daily and weekly report
- CT-12 Protection and covering plan
- CS-03 Order lists per phase
- CS-28 Purchase list with supplier and stock
- BS Specification
- HB Build guide
- BS-02 Manufacturers' installation instructions
- KW-01 Inspection plan per building phase
- KW-02 Inspection forms
- KW-06 Screed moisture measurement
- OP-01 Pre-inspection and snagging list
For the contractor (estimating and purchasing)
Quantities, order lists, schedules for price requests and the programme.
82 planned documents
Show the list
- AL-01 Cover sheet and project data
- AL-02 List of documents and drawings
- AL-03 Status statement and reading guide
- AL-04 Starting points and client brief
- AL-05 Register of conditional items
- AL-06 Change log per revision
- AL-07 Contact list of project parties
- AL-09 Demarcation list
- LO-01 Cadastral map and ownership data
- LO-02 Check against the zoning plan
- LO-04 Soil sounding and foundation advice
- LO-09 Photo report of existing state and neighbours
- LO-10 Structural survey of the existing building
- LO-11 Municipal archive drawings
- LO-15 Application for utility connections
- AR-15 Room schedule NEN 2580
- AR-16 Window and frame schedule
- AR-17 Door schedule
- AR-18 Material schedule
- AR-19 Finishes schedule
- AR-24 Open items register
- AR-34 Door hardware schedule
- AR-35 Glazing schedule
- AR-39 Colour and materials schedule
- CD-02 Foundation beam reinforcement and bending schedule
- CD-11 Structural quantities
- CD-14 Bar bending schedule
- CD-16 Foundation variants and ground slab
- CD-27 Pile driving or boring log
- CD-28 Survey of the existing foundation
- EN-10 Rc and U-value schedule
- EL-08 Electrical materials list
- EL-09 Cable journal and phase loads
- EL-14 PV registration and feed-in
- WR-05 Bathroom sanitary specification
- WR-06 Water and drainage materials list
- WR-10 Selection list for sanitary ware and tiles
- HV-08 HVAC materials list
- TR-03 Earthworks and soil balance
- VG Permit and Wkb checklist
- VG-01 Permit check (Omgevingsloket)
- VG-12 Consent of ground-lease holder or landowner
- VH-01 Health and safety plan, design phase
- VH-02 Health and safety plan, construction phase
- CT-01 Schedule
- CT-03 Deliveries and lead times
- CT-08 Overview of subcontractors and suppliers
- CT-09 Daily and weekly report
- CT-10 Minutes of the site meeting
- CS-01 Element estimate
- CS-02 Quantity take-off
- CS-03 Order lists per phase
- CS-04 RFQ packages per subcontractor
- CS-05 Payment schedule and cash flow
- CS-06 Self-build variant
- CS-07 Provisional sums and options
- CS-08 Cost indicators
- CS-20 Cost estimate: summary, quantities, procurement, payments, labour and sources
- CS-21 Internal working budget
- CS-22 Surcharges and profit
- CS-23 Rates sheet per trade
- CS-25 Budget check and justification
- CS-26 Labour budget per trade and phase
- CS-27 Price and source register
- CS-28 Purchase list with supplier and stock
- CS-29 Additional and omitted work statement
- CS-31 Comparison of subcontractor quotations
- CS-32 VAT check per line
- CS-34 Post-calculation
- BS Specification
- BS-03 Quality and performance declarations
- KW-01 Inspection plan per building phase
- KW-03 Photo file of inspection points
- KW-04 Delivery notes and certificates
- KW-05 Deviation register
- OP-01 Pre-inspection and snagging list
- OP-02 Handover report
- OP-07 Handover of keys and meter readings
- CO-01 Building contract
- CO-02 General terms and conditions
- CO-03 Proof of insurance
- CO-04 Security and withholding of the last instalment
For the client
Overview, choices, payment schedule and the documents you keep.
54 planned documents
Show the list
- AL-01 Cover sheet and project data
- AL-02 List of documents and drawings
- AL-03 Status statement and reading guide
- AL-04 Starting points and client brief
- AL-05 Register of conditional items
- AL-06 Change log per revision
- AL-08 3D model and visualisations
- AL-09 Demarcation list
- LO-09 Photo report of existing state and neighbours
- LO-15 Application for utility connections
- AR-13 Axonometry south-east
- AR-14 Perspective south-east (schematic)
- AR-19 Finishes schedule
- AR-24 Open items register
- AR-36 Kitchen drawing with connection points
- AR-39 Colour and materials schedule
- CD-16 Foundation variants and ground slab
- EL-11 Lighting plan and switching diagrams
- EL-14 PV registration and feed-in
- EL-15 Circuit list and installation diagram at handover
- EL-16 First inspection report NEN 1010
- WR-05 Bathroom sanitary specification
- WR-10 Selection list for sanitary ware and tiles
- WR-11 Water and drainage test reports
- HV-06 Commissioning protocol
- HV-10 Ventilation commissioning report
- TR-01 Site layout
- VG Permit and Wkb checklist
- VG-01 Permit check (Omgevingsloket)
- VG-12 Consent of ground-lease holder or landowner
- CT-01 Schedule
- CT-10 Minutes of the site meeting
- CT-11 Letter to residents and neighbours
- CS-05 Payment schedule and cash flow
- CS-06 Self-build variant
- CS-07 Provisional sums and options
- CS-24 Quotation for the client
- CS-25 Budget check and justification
- CS-29 Additional and omitted work statement
- CS-30 Client options list with surcharge
- BS Specification
- OP-01 Pre-inspection and snagging list
- OP-02 Handover report
- OP-03 As-built drawings
- OP-04 Consumer dossier
- OP-05 Operating and maintenance instructions
- OP-06 Warranty statements
- OP-07 Handover of keys and meter readings
- OP-08 Maintenance plan
- CO-01 Building contract
- CO-02 General terms and conditions
- CO-03 Proof of insurance
- CO-04 Security and withholding of the last instalment
- CO-05 Information to the consumer on insurance
All documents by section
For each document: kind, file format, status and when it is needed.
10Safety
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| VH-01 | Health and safety plan, design phaserisks arising from the design | Document | Planned | Always | |
| VH-02 | Health and safety plan, construction phaseproject-specific risks and measures | Document | Planned | Always | |
| VH-03 | Construction safety plan for the surroundingssafety of surroundings and traffic | Document | Planned | Only if: permit needed | |
| VH-04 | Scaffolding, hoisting and fall protection planscaffolds, lifting operations, edge protection | Drawing | pdf, dxf | Planned | Always |
| VH-05 | Site rules and emergency planaccess, protective equipment, first aid, emergency numbers | Document | Planned | Always | |
| VH-06 | Dust and asbestos controlworking method during demolition: extraction and screening | Document | Planned | Only if: hazardous materials |
11Execution
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| CT-01 | Schedulebar chart per phase | Schedule | pdf, xlsx | Planned | Always |
| CT-02 | Wkb inspection pointsinspection points and evidence per phase | Schedule | pdf, xlsx | Planned | Always |
| CT-03 | Deliveries and lead timeswhat to order, when, lead time | Schedule | pdf, xlsx | Planned | Always |
| CT-04 | Site logisticsstorage, site cabin, crane, access and removal | Drawing | pdf, dxf | Planned | Only if: site survey |
| CT-05 | Work plan per phasesequence of work, crews, points of attention | Document | Planned | Always | |
| CT-06 | Waste and skip plantypes of waste, skips, removal | Document | Planned | Always | |
| CT-07 | Site facilitiessite power, site water, cabin, toilet | Document | Planned | Only if: utility connection | |
| CT-08 | Overview of subcontractors and supplierswho does what, contact, status of the order | Schedule | pdf, xlsx | Planned | Always |
| CT-09 | Daily and weekly reportattendance, work, weather, special events | Form | pdf, xlsx | Planned | Always |
| CT-10 | Minutes of the site meetingagreements, actions, deadlines | Form | pdf, xlsx | Planned | Always |
| CT-11 | Letter to residents and neighboursschedule, working hours, nuisance, contact | Document | Planned | Always | |
| CT-12 | Protection and covering planprotecting floors, stairs, lift and furniture | Document | Planned | Always |
12Costs and purchasing
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| CS-01 | Element estimatecost per building element | Schedule | pdf, xlsx | Planned | Always |
| CS-02 | Quantity take-offquantities per item | Schedule | pdf, xlsx | Planned | Always |
| CS-03 | Order lists per phasematerial per phase in purchasing units | Schedule | pdf, xlsx | Planned | Always |
| CS-04 | RFQ packages per subcontractorrequest for quotation per trade | Document | Planned | Always | |
| CS-05 | Payment schedule and cash flowpayment instalments and cash flow | Schedule | pdf, xlsx | Planned | Always |
| CS-06 | Self-build variantwhat the client can do personally and the saving | Schedule | pdf, xlsx | Planned | Always |
| CS-07 | Provisional sums and optionsprovisional sums with settlement prices | Schedule | pdf, xlsx | Planned | Always |
| CS-08 | Cost indicatorscost per m² and per item | Schedule | pdf, xlsx | Planned | Always |
| CS-20 | Cost estimate: summary, quantities, procurement, payments, labour and sourcesfull estimate with sources | Document | Planned | Always | |
| CS-21 | Internal working budgetmaterial, labour, equipment, subcontracting | Schedule | pdf, xlsx | Planned | Always |
| CS-22 | Surcharges and profitsite costs, overheads, risk, profit | Schedule | pdf, xlsx | Planned | Always |
| CS-23 | Rates sheet per tradehourly rate per trade | Schedule | pdf, xlsx | Planned | Always |
| CS-24 | Quotation for the clientprice per item, provisional sums, conditions, validity | Document | Planned | Always | |
| CS-25 | Budget check and justificationbudget, price, shortfall or margin, options | Schedule | pdf, xlsx | Planned | Always |
| CS-26 | Labour budget per trade and phasehours per trade and phase | Schedule | pdf, xlsx | Planned | Always |
| CS-27 | Price and source registerprice, supplier, date and source per line | Schedule | pdf, xlsx | Planned | Always |
| CS-28 | Purchase list with supplier and stockcheapest offer in stock, alternative, date | Schedule | pdf, xlsx | Planned | Always |
| CS-29 | Additional and omitted work statementchange, price, approval of the client | Form | pdf, xlsx | Planned | Always |
| CS-30 | Client options list with surchargeoptions and price per option | Schedule | pdf, xlsx | Planned | Always |
| CS-31 | Comparison of subcontractor quotationsprices side by side; differences in scope | Schedule | pdf, xlsx | Planned | Always |
| CS-32 | VAT check per linewhich rate applies per item | Schedule | pdf, xlsx | Planned | Always |
| CS-34 | Post-calculationactual costs against the budget | Schedule | pdf, xlsx | Planned | Always |
13Specification and builder's guide
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| BS | Specificationtechnical description per item | Document | Planned | Always | |
| HB | Build guideexecution guide per phase | Document | Planned | Always | |
| BS-02 | Manufacturers' installation instructionsinstallation instructions for the products used | Document | Planned | Always | |
| BS-03 | Quality and performance declarationsKOMO, CE and declaration of performance per product | Document | Planned | Always |
14Quality and inspections
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| KW-01 | Inspection plan per building phasewhat to inspect, when, by whom, which evidence | Schedule | pdf, xlsx | Planned | Always |
| KW-02 | Inspection formschecklist per inspection point | Form | pdf, xlsx | Planned | Always |
| KW-03 | Photo file of inspection pointsreinforcement, insulation, air tightness, pipes before closing | Report | Planned | Always | |
| KW-04 | Delivery notes and certificatesconcrete, steel, timber, insulation | Document | Planned | Always | |
| KW-05 | Deviation registerdeviation, cause, repair, approval | Schedule | pdf, xlsx | Planned | Always |
| KW-06 | Screed moisture measurementresidual moisture before the floor finish | Report | Planned | Always |
15Handover
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| OP-01 | Pre-inspection and snagging listdefects per room; repair period | Form | pdf, xlsx | Planned | Always |
| OP-02 | Handover reportdate, remaining items, signatures | Form | pdf, xlsx | Planned | Always |
| OP-03 | As-built drawingsas built, all disciplines | Drawing | pdf, dxf | Planned | Always |
| OP-04 | Consumer dossierdrawings, materials, installations, maintenance | Document | Planned | Always | |
| OP-05 | Operating and maintenance instructionsoperation and care of installations and finishes | Document | Planned | Always | |
| OP-06 | Warranty statementswarranties from suppliers and installers | Document | Planned | Always | |
| OP-07 | Handover of keys and meter readingskeys, codes, meter readings on the handover date | Form | pdf, xlsx | Planned | Always |
| OP-08 | Maintenance planwhat to maintain and how often | Document | Planned | Always |
16Contract
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| CO-01 | Building contractparties, work, price, schedule, conditions | Document | Planned | Always | |
| CO-02 | General terms and conditionsconditions of the contractor | Document | Planned | Always | |
| CO-03 | Proof of insuranceconstruction and liability insurance | Document | Planned | Always | |
| CO-04 | Security and withholding of the last instalmentarrangement for the last payment | Document | Planned | Always | |
| CO-05 | Information to the consumer on insurancewhether and how defects and insolvency are covered | Document | Planned | Always |
00General
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| AL-01 | Cover sheet and project dataaddress, cadastral parcel, parties, date, revision | Document | Planned | Always | |
| AL-02 | List of documents and drawingsall documents with code, version, date and status | Schedule | pdf, xlsx | Planned | Always |
| AL-03 | Status statement and reading guidedraft or final; what the document is and is not valid for | Document | PlannedDraft | Always | |
| AL-04 | Starting points and client briefwishes, budget, floor area, finish level, assumptions | Document | Planned | Always | |
| AL-05 | Register of conditional itemsper item: reason, survey needed, possible price effect | Schedule | pdf, xlsx | Planned | Always |
| AL-06 | Change log per revisionwhat changed, by whom, when | Schedule | pdf, xlsx | Planned | Always |
| AL-07 | Contact list of project partiesclient, contractor, advisers, installers, grid operators | Schedule | pdf, xlsx | Planned | Always |
| AL-08 | 3D model and visualisationsGLB model and renders of exterior and interior | 3D model | glb | Planned | Always |
| AL-09 | Demarcation listwho supplies and installs what: contractor, client, third parties | Schedule | pdf, xlsx | Planned | Always |
01Site and surveys
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| LO-01 | Cadastral map and ownership dataplot boundaries, easements, ground lease (erfpacht) | Document | Planned | Only if: site survey | |
| LO-02 | Check against the zoning planland use, building envelope, eaves and building height, distances | Report | PlannedDraft | Only if: permit needed | |
| LO-03 | Land survey of the plotboundaries, levels, existing objects | Drawing | pdf, dxf | Planned | Only if: site survey |
| LO-04 | Soil sounding and foundation advicebearing capacity, foundation method, pile level, groundwater level | Report | Planned | Only if: soil survey | |
| LO-05 | Environmental soil investigationquality of soil and groundwater | Report | Planned | Only if: soil survey, permit needed | |
| LO-06 | KLIC notification and excavation maplocation of cables and pipes in the ground | Document | Planned | Only if: utility connection | |
| LO-07 | Asbestos inventory reportasbestos-containing materials and risk class | Report | Planned | Only if: hazardous materials | |
| LO-08 | Drawings of the existing situationplans, elevations and sections as measured; existing next to new | Drawing | pdf, dxf | Planned | Only if: existing building |
| LO-09 | Photo report of existing state and neighboursphotos before the start; cracks and damage recorded | Report | Planned | Only if: existing building | |
| LO-10 | Structural survey of the existing buildingload-bearing walls, floors, pipework, defects | Report | PlannedIndicative, not for construction · for structural engineer to check | Only if: existing building, structural work | |
| LO-11 | Municipal archive drawingsold building drawings and permits | Document | Planned | Only if: existing building | |
| LO-12 | Nature assessment (quickscan)protected species, for example bats | Report | Planned | Only if: permit needed | |
| LO-15 | Application for utility connectionselectricity, water, sewer, fibre; capacity and date | Form | pdf, xlsx | Planned | Only if: utility connection |
02Architecture
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| AR-01 | Site planplot, building, distances, north arrow | Drawing | pdf, dxf | Planned | Only if: site survey, permit needed |
| AR-02 | Ground floor planlayout, dimensions, room names | Drawing | pdf, dxf | Planned | Always |
| AR-03 | First floor planlayout, dimensions, room names | Drawing | pdf, dxf | Planned | Always |
| AR-04 | Roof planroof planes, falls, gutters, roof penetrations | Drawing | pdf, dxf | Planned | Always |
| AR-05 | Elevations north + eastviews with heights and materials | Drawing | pdf, dxf | Planned | Always |
| AR-06 | Elevations south + westviews with heights and materials | Drawing | pdf, dxf | Planned | Always |
| AR-07 | Section A-Aheights, floor build-up, roof build-up | Drawing | pdf, dxf | Planned | Always |
| AR-08 | Section B-Bsecond section, at right angles to A-A | Drawing | pdf, dxf | Planned | Always |
| AR-09 | Details: foundation and floorjunctions at detail scale | Drawing | pdf, dxf | Planned | Only if: soil survey, structural work |
| AR-10 | Details: facadewall build-up, insulation, cavity | Drawing | pdf, dxf | Planned | Always |
| AR-11 | Details: window framessill, head and jamb junction of the frame | Drawing | pdf, dxf | Planned | Always |
| AR-12 | Details: roofroof edge, gutter, ridge, penetrations | Drawing | pdf, dxf | Planned | Always |
| AR-13 | Axonometry south-eastspatial overview of the building | Diagram | pdf, dxf | Planned | Always |
| AR-14 | Perspective south-east (schematic)schematic image of the building | Diagram | pdf, dxf | Planned | Always |
| AR-15 | Room schedule NEN 2580areas per room, GO and BVO | Schedule | pdf, xlsx | Planned | Always |
| AR-16 | Window and frame schedulemark, size, swing direction and glass per window | Schedule | pdf, xlsx | Planned | Always |
| AR-17 | Door scheduledoor type, size, swing direction | Schedule | pdf, xlsx | Planned | Always |
| AR-18 | Material schedulematerials per building element | Schedule | pdf, xlsx | Planned | Always |
| AR-19 | Finishes schedulefloor, wall and ceiling per room | Schedule | pdf, xlsx | Planned | Always |
| AR-20 | Brick coursing and dimensionsbrickwork in courses, levels | Drawing | pdf, dxf | Planned | Always |
| AR-21 | Fire safetysmoke alarms, escape route, fire compartments | Drawing | pdf, dxf | Planned | Only if: permit needed |
| AR-22 | Accessibility and Bbl checklistcheck against the building rules per item | Schedule | pdf, xlsx | Planned | Only if: permit needed |
| AR-23 | Details: interior and stairstair, balustrade, interior frames | Drawing | pdf, dxf | Planned | Always |
| AR-24 | Open items registerwhat still has to be confirmed or supplied | Schedule | pdf, xlsx | Planned | Always |
| AR-25 | Floor and ceiling plansfloor finish and ceilings per room | Drawing | pdf, dxf | Planned | Always |
| AR-26 | Wet rooms, wall developmentswall views of bathroom and toilet with tiling | Drawing | pdf, dxf | Planned | Always |
| AR-27 | Stair, calculation and checkrise, going, headroom | Calculation | pdf, xlsx | Planned | Always |
| AR-28 | Wall junctionswall junction with floor, window and roof | Drawing | pdf, dxf | Planned | Always |
| AR-29 | Roof junctionsroof junctions | Drawing | pdf, dxf | Planned | Always |
| AR-30 | Foundation junctionsjunction of foundation, floor and wall | Drawing | pdf, dxf | Planned | Only if: soil survey, structural work |
| AR-31 | Working plans 1:50full dimensioning, openings, levels | Drawing | pdf, dxf | Planned | Always |
| AR-32 | Setting-out plan and levelsgrid, setting-out dimensions, level relative to NAP | Drawing | pdf, dxf | Planned | Only if: site survey |
| AR-33 | Overview of wall typesbuild-up per wall type, fire and sound requirement | Drawing | pdf, dxf | Planned | Always |
| AR-34 | Door hardware schedulehinges, locks, handles, burglar resistance | Schedule | pdf, xlsx | Planned | Always |
| AR-35 | Glazing scheduleglass type, U-value, safety glass | Schedule | pdf, xlsx | Planned | Always |
| AR-36 | Kitchen drawing with connection pointslayout, water, drain, electrics, extraction | Drawing | pdf, dxf | Planned | Always |
| AR-37 | Tile layout planlaying direction, starting point, cutting loss | Drawing | pdf, dxf | Planned | Always |
| AR-38 | Movement joint plan for brickworkmovement joints and façade supports | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| AR-39 | Colour and materials schedulebrand, type and colour code, outside and inside | Schedule | pdf, xlsx | Planned | Always |
| AR-40 | Details of the junction with the existing buildingopening in the façade; junction of floor, roof and foundation | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: existing building, structural work |
03Structure
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| CD-01 | Foundation plan and concrete pour planfoundation strips or beams, dimensions, pouring sequence | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: soil survey, structural work |
| CD-02 | Foundation beam reinforcement and bending schedulereinforcement per beam, draft | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: soil survey, structural work |
| CD-03 | Ground floor slabfloor type, span, insulation | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-04 | First floor slabfloor type, span, openings | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-05 | Load-bearing walls and lintelsload-bearing walls, lintels, bearings | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-06 | Roof structurerafters, purlins, anchoring | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-07 | Structural detailsanchorages and connections | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-08 | Stabilitybracing walls and diaphragm action | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-09 | Loads and design basisloads, materials, standards | Calculation | pdf, xlsx | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-10 | Structural calculationindicative calculation of the main load-bearing structure | Calculation | pdf, xlsx | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-11 | Structural quantitiesconcrete, steel, timber, floors | Schedule | pdf, xlsx | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-12 | Structural inspection planinspection points: reinforcement, pour, floors | Schedule | pdf, xlsx | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-13 | Formwork and strike timesformwork method and waiting times | Schedule | pdf, xlsx | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-14 | Bar bending schedulebars per position, draft | Schedule | pdf, xlsx | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-15 | Concrete pours and jointsdivision of the pours and joint locations | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-16 | Foundation variants and ground slabpiles, strips or slab: choice and consequences | Schedule | pdf, xlsx | PlannedIndicative, not for construction · for structural engineer to check | Only if: soil survey |
| CD-17 | Slab layout, lintels and bearingsslab laying plan, lintels, bearing lengths | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-18 | Pile planpile numbers, loads, driving levels | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: soil survey, structural work |
| CD-19 | Signed structural calculationfinal calculation by the structural engineer | Calculation | pdf, xlsx | Planned | Only if: structural work |
| CD-20 | Final reinforcement drawings and schedulesreleased for ordering steel | Drawing | pdf, dxf | Planned | Only if: structural work |
| CD-21 | Steel structure and steel schedulesections, connections, corrosion protection | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-22 | Timber structure and timber schedulefloor joists, roof, timber sizes and lengths | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work |
| CD-23 | Prefab layout and production drawingsfloors and walls from the supplier | Drawing | pdf, dxf | Planned | Only if: structural work |
| CD-24 | Opening in a load-bearing wallcalculation, lintel or portal frame, bearings | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work, existing building |
| CD-25 | Demolition and propping plandemolition sequence and temporary support | Drawing | pdf, dxf | PlannedIndicative, not for construction · for structural engineer to check | Only if: structural work, existing building |
| CD-26 | Dewatering and excavation supportlowering the groundwater; excavation enclosure | Report | Planned | Only if: soil survey | |
| CD-27 | Pile driving or boring logper pile: depth and final set | Report | Planned | Only if: soil survey | |
| CD-28 | Survey of the existing foundationtype, condition and bearing capacity | Report | Planned | Only if: soil survey, existing building |
04Building physics and energy
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| EN-01 | Thermal envelopeinsulation line and Rc values | Drawing | pdf, dxf | Planned | Only if: energy calculation |
| EN-03 | Daylightdaylight check for each habitable room | Calculation | pdf, xlsx | Planned | Only if: energy calculation |
| EN-04 | Ventilationrequired and designed air flows | Calculation | pdf, xlsx | Planned | Only if: energy calculation |
| EN-05 | Acoustics and firesound insulation and fire resistance | Calculation | pdf, xlsx | Planned | Only if: energy calculation |
| EN-10 | Rc and U-value schedulethermal value of each construction and window | Schedule | pdf, xlsx | Planned | Only if: energy calculation |
| EN-12 | Noise calculation for the heat pump outdoor unitnoise at the plot boundary | Calculation | pdf, xlsx | Planned | Only if: permit needed |
05Electrical
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| EL-01 | Electrical plan ground floorsockets, light points, switches, circuits | Drawing | pdf, dxf | Planned | Always |
| EL-02 | Electrical plan first floorsockets, light points, switches, circuits | Drawing | pdf, dxf | Planned | Always |
| EL-03 | Consumer unit (single-line diagram), PV, charging pointcircuits, protection, residual-current devices | Diagram | pdf, dxf | Planned | Only if: utility connection |
| EL-04 | Electrical calculationsload, cable cross-section, voltage drop | Calculation | pdf, xlsx | Planned | Always |
| EL-05 | Earthing and equipotential bondingearth electrode; bonding in the bathroom | Drawing | pdf, dxf | Planned | Always |
| EL-06 | Cable routesroutes, conduits, penetrations | Drawing | pdf, dxf | Planned | Always |
| EL-07 | PV, charge point and EMSpanels, inverter, charge point, energy management | Diagram | pdf, dxf | Planned | Only if: utility connection |
| EL-08 | Electrical materials listmaterials with quantities | Schedule | pdf, xlsx | Planned | Always |
| EL-09 | Cable journal and phase loadscable per circuit, length, distribution over phases | Schedule | pdf, xlsx | Planned | Always |
| EL-10 | Meter cupboard layoutlocation, dimensions, entries, arrangement | Drawing | pdf, dxf | Planned | Only if: utility connection |
| EL-11 | Lighting plan and switching diagramsluminaires, switching, dimmers | Drawing | pdf, dxf | Planned | Always |
| EL-12 | Low-voltage and datadata, fibre, TV, doorbell, intercom | Drawing | pdf, dxf | Planned | Always |
| EL-13 | Smoke detectors and emergency lightingposition and interconnection; emergency lighting in an office | Drawing | pdf, dxf | Planned | Always |
| EL-14 | PV registration and feed-inregistration of the installation with the grid operator | Form | pdf, xlsx | Planned | Only if: utility connection |
| EL-15 | Circuit list and installation diagram at handoverfinal circuit layout at handover | Document | Planned | Always | |
| EL-16 | First inspection report NEN 1010measurements and testing of the installation | Report | Planned | Always |
06Water and drainage
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| WR-01 | Water and drainage ground floorpipes, drains, draw-off points | Drawing | pdf, dxf | Planned | Only if: utility connection |
| WR-02 | Water, drainage and rainwater first floorpipes, drains and rainwater drainage | Drawing | pdf, dxf | Planned | Always |
| WR-03 | Drainage and rainwater isometricdrain pipes with diameters and fall | Diagram | pdf, dxf | Planned | Always |
| WR-04 | Calculation NEN 1006water supply: flow, diameters, waiting time | Calculation | pdf, xlsx | Planned | Always |
| WR-05 | Bathroom sanitary specificationfixtures, taps, installation heights | Schedule | pdf, xlsx | Planned | Always |
| WR-06 | Water and drainage materials listmaterials with quantities | Schedule | pdf, xlsx | Planned | Always |
| WR-07 | Supply water axonometriccold and hot water pipes | Diagram | pdf, dxf | Planned | Always |
| WR-08 | External drainage and connection to the public sewerfoul and rainwater separate, manholes, falls | Drawing | pdf, dxf | Planned | Only if: utility connection |
| WR-09 | Rainwater: calculation, emergency overflows, infiltrationcapacity of gutters and pipes; storage on the plot | Calculation | pdf, xlsx | Planned | Only if: permit needed |
| WR-10 | Selection list for sanitary ware and tilesclient's choices with article numbers | Schedule | pdf, xlsx | Planned | Always |
| WR-11 | Water and drainage test reportspressure test of the water supply; tightness of the drainage | Report | Planned | Always |
07Heating and ventilation
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| HV-01 | Heat loss calculationrequired output per room | Calculation | pdf, xlsx | Planned | Only if: energy calculation |
| HV-02 | Underfloor heating layoutcircuits, pipe spacing, manifold | Drawing | pdf, dxf | Planned | Always |
| HV-03 | Heat pump and hydraulic diagramunit, buffer tank, boiler, fittings | Diagram | pdf, dxf | Planned | Always |
| HV-04 | Ventilation HRV duct planducts, valves, air flows | Drawing | pdf, dxf | Planned | Always |
| HV-05 | Controlsthermostats, zones, control | Diagram | pdf, dxf | Planned | Always |
| HV-06 | Commissioning protocolvalues to be filled in at handover | Form | pdf, xlsx | Planned | Always |
| HV-07 | Installation isometricthree-dimensional overview of the pipes | Diagram | pdf, dxf | Planned | Always |
| HV-08 | HVAC materials listmaterials with quantities | Schedule | pdf, xlsx | Planned | Always |
| HV-09 | Installation detailspenetrations, arrangement, fixing | Drawing | pdf, dxf | Planned | Always |
| HV-10 | Ventilation commissioning reportmeasured air flows per room | Report | Planned | Always | |
| HV-11 | Floor heating start-up protocolgradual heating of the screed | Form | pdf, xlsx | Planned | Always |
| HV-13 | Technical room layoutarrangement of equipment, free space, drain | Drawing | pdf, dxf | Planned | Always |
08Site works
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| TR-01 | Site layoutpaving, parking, greenery, boundary fences | Drawing | pdf, dxf | Planned | Only if: site survey |
| TR-02 | Levels and site drainageheights, falls, rainwater discharge | Drawing | pdf, dxf | Planned | Only if: site survey |
| TR-03 | Earthworks and soil balanceexcavation, backfill, removal | Schedule | pdf, xlsx | Planned | Only if: soil survey |
| TR-05 | Shed, fence and outbuildingslocation, size and material | Drawing | pdf, dxf | Planned | Only if: permit needed |
09Permits and Wkb
| Code | Document | Kind | Format | Status | When |
|---|---|---|---|---|---|
| VG | Permit and Wkb checklistwhich permits and notifications are needed | Document | Planned | Only if: permit needed | |
| VG-01 | Permit check (Omgevingsloket)outcome: permit, notification or exempt | Document | Planned | Only if: permit needed | |
| VG-02 | Application set for the environmental permitdrawings and forms for the application | Document | Planned | Only if: permit needed | |
| VG-03 | Statement on appearance and environmental qualitymaterials, colours, fit with the surroundings | Document | Planned | Only if: permit needed | |
| VG-05 | Notice of start and end of building worknotification to the municipality | Form | pdf, xlsx | Planned | Only if: permit needed |
| VG-07 | Demolition notificationnotification of demolition to the municipality | Form | pdf, xlsx | Planned | Only if: hazardous materials |
| VG-08 | Permit or notification for the renovationtechnical review of the renovation | Form | pdf, xlsx | Planned | Only if: permit needed |
| VG-09 | Permit for use of public spacecontainer, scaffold or crane on the street | Form | pdf, xlsx | Planned | Only if: permit needed |
| VG-11 | Monument or protected areaadditional permit and requirements | Document | Planned | Only if: permit needed | |
| VG-12 | Consent of ground-lease holder or landownerconsent to build or alter | Document | Planned | Only if: permit needed | |
| VG-13 | Dewatering notificationnotification or permit with the water board | Form | pdf, xlsx | Planned | Only if: permit needed, soil survey |
What you need from third parties
Others supply these documents, such as a surveyor, a testing firm, the municipality or the land registry. They are not part of our package; here you see what you need them for.
| Code | Document | What it is for |
|---|---|---|
| LO-01 | Cadastral map and ownership data | plot boundaries, easements, ground lease (erfpacht) |
| LO-03 | Land survey of the plot | boundaries, levels, existing objects |
| LO-04 | Soil sounding and foundation advice | bearing capacity, foundation method, pile level, groundwater level |
| LO-05 | Environmental soil investigation | quality of soil and groundwater |
| LO-06 | KLIC notification and excavation map | location of cables and pipes in the ground |
| LO-07 | Asbestos inventory report | asbestos-containing materials and risk class |
| LO-10 | Structural survey of the existing building | load-bearing walls, floors, pipework, defects |
| LO-11 | Municipal archive drawings | old building drawings and permits |
| LO-12 | Nature assessment (quickscan) | protected species, for example bats |
| LO-15 | Application for utility connections | electricity, water, sewer, fibre; capacity and date |
| CD-18 | Pile plan | pile numbers, loads, driving levels |
| CD-19 | Signed structural calculation | final calculation by the structural engineer |
| CD-20 | Final reinforcement drawings and schedules | released for ordering steel |
| CD-21 | Steel structure and steel schedule | sections, connections, corrosion protection |
| CD-23 | Prefab layout and production drawings | floors and walls from the supplier |
| CD-24 | Opening in a load-bearing wall | calculation, lintel or portal frame, bearings |
| CD-25 | Demolition and propping plan | demolition sequence and temporary support |
| CD-26 | Dewatering and excavation support | lowering the groundwater; excavation enclosure |
| CD-27 | Pile driving or boring log | per pile: depth and final set |
| CD-28 | Survey of the existing foundation | type, condition and bearing capacity |
| EL-14 | PV registration and feed-in | registration of the installation with the grid operator |
| EL-15 | Circuit list and installation diagram at handover | final circuit layout at handover |
| EL-16 | First inspection report NEN 1010 | measurements and testing of the installation |
| WR-11 | Water and drainage test reports | pressure test of the water supply; tightness of the drainage |
| HV-10 | Ventilation commissioning report | measured air flows per room |
| HV-11 | Floor heating start-up protocol | gradual heating of the screed |
| VG-05 | Notice of start and end of building work | notification to the municipality |
| VG-07 | Demolition notification | notification of demolition to the municipality |
| VG-08 | Permit or notification for the renovation | technical review of the renovation |
| VG-09 | Permit for use of public space | container, scaffold or crane on the street |
| VG-11 | Monument or protected area | additional permit and requirements |
| VG-12 | Consent of ground-lease holder or landowner | consent to build or alter |
| VG-13 | Dewatering notification | notification or permit with the water board |
| VH-01 | Health and safety plan, design phase | risks arising from the design |
| VH-04 | Scaffolding, hoisting and fall protection plan | scaffolds, lifting operations, edge protection |
| CT-07 | Site facilities | site power, site water, cabin, toilet |
| CT-08 | Overview of subcontractors and suppliers | who does what, contact, status of the order |
| BS-02 | Manufacturers' installation instructions | installation instructions for the products used |
| BS-03 | Quality and performance declarations | KOMO, CE and declaration of performance per product |
| KW-03 | Photo file of inspection points | reinforcement, insulation, air tightness, pipes before closing |
| KW-04 | Delivery notes and certificates | concrete, steel, timber, insulation |
| KW-06 | Screed moisture measurement | residual moisture before the floor finish |
| OP-05 | Operating and maintenance instructions | operation and care of installations and finishes |
| OP-06 | Warranty statements | warranties from suppliers and installers |
| CO-01 | Building contract | parties, work, price, schedule, conditions |
| CO-02 | General terms and conditions | conditions of the contractor |
| CO-03 | Proof of insurance | construction and liability insurance |
| CO-04 | Security and withholding of the last instalment | arrangement for the last payment |
| CO-05 | Information to the consumer on insurance | whether and how defects and insolvency are covered |